Principle When air is purified and heated, it is introduced from the bottom of exhaust fan and passes through screen plate of raw material. In working chamber, the state of fluidization is formed through stirring and negative pressure. The moisture is evaporated and removed rapidly and raw material is dried quickly
Features 1. The structure of fluid bed is of round so as to avoid dead corner. Inside the hopper there is a stir in order to avoid agglomeration of raw material and forming canal of flow. (Small machine does not support stirrer) 2. The granule is discharged through the method of turning over. In this way, it is very convenient and quickly. Discharging system can be designed by requirement. 3. It is operated at the conditions of negative pressure and seal. The air is filtered. Therefore it is simple in operation and convenient in cleaning. It is ideal equipment that is in conformity with the requirement of GMP. 4. The drying speed is fast and temperature is uniform. In general the drying time is 20-30 minutes.
Technical Parameter
Model
GFG-100
Feeding(kg)
1000
Fan
Air volume(m³/h)
3488
Air pressure(mm)
533
Power(kw)
11
Mixing power(kw)
0.55
Mixing rotation speed(r/min)
11
Steam consumption(kg/h)
170
Operating time(min)
15-30
Machine height
Square(min)
2850
Round(min)
2900
Production process
Exhibition room
Shipping
Certificates
Pre-sale service 1. Help clients to choose the most suitable machine 2. Supply detailed machine instruction,principle of operation 3.ProOur Services duce the machine according to clients' requirement
After-sale service 1. One year warranty 2. 24 hours online to solve any problem; supply you English manual book and technical support, maintain and install video to help you solve the problem, or dispatch worker to your factory. FAQ Q1: What is the warranty for this machine? A1: 1 year. Q2: Do you offer oversea installation? A2: We'll send professional installation engineer to help you install the equipment, and train the operators. But the buyers must take the charge of round trip air ticket and accommodation. Also your should pay engineer $80 per day.
Q3: How long is the lead time? A3: Generally 25 working days, for special orders, please contact sales manager for confirmation.
Q4: What's the terms of delivery? A4: Shipping and Air Express as DHL, FedEx, TNT, UPS, EMS, for details, please contact sales manager.