8X10W RGBW 4in1 DMX Spider Beam LED Moving Head Lighting Fixture

Min.Order: 1
Product origin: Guangzhou, Guangdong, China
Infringement complaint: complaintComplaint
US$ 180 ~ 220

Description

8X10W RGBW 4in1 DMX Spider Beam LED Moving Head Lighting Fixture

AMD9922 led spider beam moving head light is equipped with 8PCS 10W high brightness white LEDS.
with a lighting base
Each LED is individually controlled

Specifications
ModelAMD9922
VoltageAC100V-240V, 50/60HZ
Power Supply120W
Beam Angle4.5°
Light Source8pcs 10W white led or 4in1RGBW
LED Lifetime60,000 hours-100000hours
Control Channel13/16CH
Control ModeDMX512/Master-slave, sound activated, auto run
StrobeVariable strobe speeds
Dimmer0-100% linear dimming
Pan/Tit540°/180°
DisplayLCD display
IP RatingIP20
Outer package size51*38*38cm
N.W/G.W9KG/11KG
ApplicationsThis light is majorly used for bar,club,etc.It looks more nice under the smoke.It's beam effect,it makes the stage more dynamic











Warranty:
a) We have One year warranty for our products.
b) For damage on arrival, please claim to the shipping company firstly and get the claim number and inform us,also take the photos on the damage and send to us for verifying, we will help you to claim to the shipping company to get the compensation.
c) If there is the problem with the product, firstly you need send the pictures or the video to us, let us make surewhat's problem about the product. If the problem can use the parts to solve,
we will offer you the replacement for free during warranty time.
 
FAQ:
Q:Are you a factory or trade company?
A:We are a professional stage lighting factory.

Q:Do you accept OEM or ODM?
A:We accept OEM but not for ODM now.

Q:What's the delivery time?
A:Usually,it costs about 3 to 7 days for sample and more time for bulk order.Eg,as for a 20 cabniet,we need about 20 days to prepare well.

Q:What's the payment term?
A:We accept T/T,western union and paypal.

Q:Are the products of good quality?How can you ensure it?
A:Yes,the quality is good.We have strict test before shipping.We have test for semi-manufactured products about 3 days and 2 days for end product
Product Tag:
Related categories:
Scroll to Top