Socket Drive Hub Power Installed Anchor for Electric Transmission Power Tower

Min.Order: 10
Product origin: Wuxi, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 29000 ~ 30000

Description
Socket Drive Hub Power Installed Anchor for Electric Transmission Power Tower

Voltage10kv-500kv
HeightAccording to drawing
Surface TrestmentHot dip galvanizing
Quality StandardISO 9001:2018
Welding StandardCWB
Wind Speed35m/s






Jiangsu Mingyuan Tower Co., LTD, is situated in beautiful and famous tourist city--Yixing, which is near the Shanghai with convenient transportation access. It owns the area of 63000mand the production area is about 20000m2, with the annual output capacity over 10000 tons.
 
Main products are power tower, communication tower, city traffic and lighting engineering products, prefabricated building metal components and metal structure products, etc..

Since it was founded in 2009, it becomes long-term cooperation partners and shortlisted supplier of the China's State Grid, Southern Power Grid, China Telecom, China Mobile, China Unicom, China Tower, Inner Mongolia Electric Power, Tbea, Nari-Technology, State Power South and so on. Meanwhile, our power, lighting, communications and metal structure products are exported to more than 20 countries and regions including South Africa, Ethiopia, Togo, Philippines, Korea, Vietnam, France, Britain, USA, Australia, Egypt and Cuba.




























1.Q: Can you do OEM for me?
A: We accept all OEM orders,just contact us and give me your design,we will offer you a reasonable price ASAP.
 
2. Q: Can you do design for me?
A: We have experienced designers,According to your requirement, we can ass your company logo,website,phone number or your ideas on paper box.Just give me your ideas,let us do it for you.
 
3. Q: When can I get the quotation
A: We usually quote you within 24 hours after we get your inquiry.If you are very urgent to get the quotation,please call us or tell us in mail,so that we could regard your inquiry priority.
 
4. Q: How about the delivery date?
A: For normal items delivery time is 25-35 days
 
5. Q: Which payment way is workable?
A: T/T,L/C at sight etc.




Product Tag:
Related categories:
Scroll to Top