Choke Manifold Made in China

Min.Order: 1
Product origin: Zhenjiang, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 10000

Description
Petroleum exploration and development equipment refers to comprehensive equipment for oil and natural gas exploration, drilling, development, storage and transportation, including various types of geophysical prospecting and logging equipment, drilling equipment, oil and gas production equipment, downhole operation equipment, oil and gas gathering and transportation Equipment, offshore drilling platform equipment, etc. and related accessories and tools; oil refining and petrochemical equipment refers to the complete set of equipment required in the whole process of oil and natural gas processing and conversion, including general equipment (such as various process compressors, expanders, etc.) , pumps and valves, etc.) and medical equipment (such as reactors, towers, heat exchange equipment, industrial furnaces, storage and transportation equipment, medical machinery, etc.). The equipment specifications and parameters of the oil refining and petrochemical industry are determined by the process of the oil refining and petrochemical industry. The oil refining and petrochemical industry is a process industry. The requirements for automation are high, and it is required to be able to run continuously and stably for a long period of time, so there are high requirements for the reliability of the equipment. The oil and gas exploration, development and production process is characterized by multiple links, complex technologies, and high individual requirements.



Choke Manifold

Choke manifold is a necessary device in the process of blowout control and implementation of oil and gas pressure control technology. In case that the BOP is off, the pressure at the bottom of well shall be kept higher than formation pressure through controlling casing pressure with choke valve on-off. Additionally, soft shut-in can be realized through relieving pressure with choke manifold in the process of well shut-in. When pressure in well rech at extreme limitation,it can be used to prevent blowout and protect wellhead.
1. Remote options: S-Manual, Y-hydraulic,Q-pneumatic
2. Standard principle: API16C, SY5323
3. Size: 1 13/16" - 4 1/16"
4. Pressure" 2000psi-15000psi
5. Temperature: A, B, K, P, U
6. Material: EE
7. PS: PS3

Product Tag:
Related categories:
Scroll to Top