Decoration, Furniture, Household, Industrial Aluminium Profile

Min.Order: 1
Product origin: Shenzhen, Guangdong, China
Infringement complaint: complaintComplaint
US$ 2500 ~ 3500

Description

 

 

Foshan Sinogar Aluminium Co., Ltd, founded in 1995, locates in Foshan " China Aluminum Industrial City". In past 20 years, the company has obtained a rapid development, turned into a large modern enterprise of professional manufacturing of aluminum profiles and fabricated aluminum parts in China.

Foshan Sinogar Aluminium Co., Ltd, There are800 staff working in 600,000 Square metre factory area in Guangdong. 15 sets of extrusion lines ranged from 500mt to 3600mt. Annual capacity reaches 80,000 tons.Our aluminium profiles and processing product cover more than 30 provinces and municipalities across the country and have been exported to more than 50 countries and regions around Asia, Africa, America and Europe, such as Indonesia, Philippines, Malaysia, South Africa, Spain, UK and Australia, and etc.




 

                                                                                                                                                              

Aluminium Alloy6063,6060,6061,6082
Temper

T3-T8

Quality StandardGB/T 5237-2008, EN755-9,EN12020, JST,AA STANDARD. 
Quality CertificateISO9001, ISO14001,OHSAS18001,DNV,QUALANOD, QUALICOAT
Useagewindows and doors profiles
Surface TreatmentPower coating: AKZO Noble, Tiger,DUPONT,JOTUN, etc.
PVDF: 2coated, 3 coated. 
Anodizing: Silver, Champagne, Bronze, Black,  Gold, Imitating Steel,Titanium
Wood grain: As per customers'samples.
Polishing, Mechanical, Chemcial.
Electrophoresis: Sliver,Champagne, Black, Golden,Titanium, etc.
Processing Drilling, Bending, Aluminium profile fabrication, Precise cutting ect.
MOQ3000 Kilogram
Packingprotection film + shrink plastic film or kraft paper.
Timber packing + Metal trolly; 
Payment Terms

TT 30% before production, the rest should be balanced before loading.

 

 






 

FAQ

1.Q:How long for the cutting dies and received sample? 

 

 A: Depend on the size of dies, gernerally speaking, 7-10 days for die cutting, 3days-5days sampling after die ready.  

 

2 Q:What is your lead time for production?     

 

A: For one 40ft container, 3-4week after deposit confimred. 100 tons can be ready within 4-5 weeks.

 

Scroll to Top