Highly Efficient Slab Table Formwork System Peri System

Min.Order: 300
Product origin: Yancheng, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 70 ~ 90

Description

Product Description

           The Flex-table Formwork 


The flex-table formwork system is a formwork for slab concrete pouring in complex floor plan, narrow space. It is supported by steel props or tripods with different support heads, with H20 timber beam as the primary and secondary beams, which are covered with panels. The System can be used for a clear height up to 5.90m.



Applicantion 



Characteristics

1.The most easy and flex-table Formwork System for all types of slabs, consisting of steel props, tripod, four-way head, H20 timber beam and shuttering panel.
2.It is mainly used for decking areas around lift shafts and stair cases, also for villa projects or manual handled slab formwork system with limited crane capacity.
3.This system is fully crane independent.
4.The H20 timber Beams due to its easy handling, low weight and excellent statically figures its high-grade bonding and protected beam ends with a plastic bumper assures a long duration of life.
5.This system is simple structure, convenient disassembly and assembly, flexible arrangement and reusability.


 
 
Packing & Delivery
Packing: 

1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.
 
Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Our Company

 
FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity

Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
Product Tag:
Related categories:
Scroll to Top