Description
Old Elevator Modernization Solutions
If maintained properly and in normal use situation,the average serive life of elevator is 15years.With the elevator service time countiuning, both the mechanical and electrical parts are aging and less fuctional. Consequently, the safety of elevator is degrading and potential risk is getting high. Nova Elevator has rich and leading experience in lift modernization field,especially in the control and drive system.Based on our past experience and market demand,we have prepared several integrated modernization solutions to our customers together with economic and qualified spare parts.
NOVA, working together with its clients develops customized solutions for the modernization of the older elevators combining the cost effectiveness with the highest quality outcome.
NOVA ELEVATOR MODERNIZATION SOLUTIONS cover:
1. Comfortable transport with emphasis on the passengers' safety
2. Energy savings
3. High performance levels
4. Superb compatibility
5. Minimization of the maintenance costs
6. Modern design
PART NO | ITEM | SPECIFICATION |
I | Mechanical Parts |
1.1 | Traction Machine | VVVF Geared Machine or PM Gearless Machine |
1.2 | Traction Machine Bed Set | Made for the replaced Traction Machine |
1.3 | Speed Governor | Nova Standard |
1.4 | Pulley Sheave | For above traction machine |
1.5 | Wire Rope | For above traction machine & speed governor |
1.6 | VVVF Door Operator | Replace the existing old door system |
1.7 | Landing Door System |
|
II | Electrical Parts |
2.1 | Complete Control Cabinet | VVVF in Serial or Parallel system, 2.2-37 KW, 220V/380V |
2.2 | Encorder with Cable | Installed in the Traction Machine |
2.3 | Car Top Board | Installed in the Car Top Inspection Box. |
2.4 | Display Board for COP and LOPs | Installed in the COP and LOPs. |
2.5 | Car Instruction Board | Installed in the COP. |
2.6 | COP | You may visit our website to choose the model you need: http://novaelevator.en.made-in-china.com |
2.7 | LOPs |
2.8 | Car Top Inspection Box | NOVA Standard |
.9 | Pit box | NOVA Standard |
2.10 | Leveling Photoelectric Switch | DC24V Normally Open |
2.11 | Limit Switch | Normally Close |
2.12 | All Cable | |
2.12.1 | Traveling Cable | From Control Cabinet to Car top Inspection Box. |
2.12.2 | Round Shaft Cable | From Control Cabinet to Limit Siwtchs. |
2.12.3 | Round Shaft Cable | From Control Cabinet to Pit Switch |
2.12.4 | Landing Door Lock Cable | From Control Cabinet to Landing Door Locks. |
2.12.5 | LOP Communication Cable | From Control Cabinet to LOPs. |
2.12.6 | Car Top Branch Cables | From Car Top Inspection Box to COP, Door Operator, Light Curtain and so on |
|
III | Other Opitional Parts |
3.1 | Group Controlling Board | For 3-8 units lift |
3.2 | PC Monitoring Board | Quarter Monitoring |
3.3 | ARD | Match to Control Cabinet |
3.4 | UPS | Emergency Power for Brake |
3.5 | IC Card | Installed in the COP and LOPs. |
3.6 | Voice Announcement | Broadcast to the floor information |
3.7 | Vice COP | For run-through door |
If you are interested in our old modernization, welcome to contact us as below.
Contact Person: | Ms. Jessie Chi |
| 0086 180 136 10266 |
| |
| |
Web: | http://novaelevator.en.made-in-china.com http://novaelevator.en.made-in-china.com |
| novaelevator06 |