Cost Price High Reflective Open-End Timing Belts Forlong-Trem Supply

Min.Order: 100
Product origin: Taizhou, Zhejiang, China
Infringement complaint: complaintComplaint
US$ -1

Description
 
Our Company

Sanmen Binlong Transmission Power Belt Company.

BINLONG COMPANY was founded in 2008 , is a professional supplier of power transmission belts from Sanmen, China. It is widely used in automotive, agriculture, coal, metallurgy, mining, engineering machinery, oil, textile and light industry, construction and cement and other fields. The spirit of "high quality, excellent service, continuous improvement" as business philosophy, the company since its inception, the products are exported to over 30 countries in Europe, North America, South America, Middle East, Southeast Asia, such as Italy, Spain, Poland, the United States, Argentina, South Africa, Thailand, Indonesia etc.The quality has been widely recognized by customers. 

Product Description
 
Futures:
• Colours: White / Black
• Cords: Steel / Nylon / Kevlar
• Standard length:100Meters
Endless jointed belts are suitable for conveying applications, particularly when indexing and/or positive drive is required. Supplementary application of flights, profile and coatings is possible, to suit specific application.
 

1.High Tensile Strength

2.High Transmission Accuracy

3.Good Stability

4.Anti-oil, Low Noise


Applications:

  • Office automation equipments and Vending machines
  • Machine tools and pumps
  • Textile machines
  • Paper making machines and printing machinery
  • Medical equipment, optical instruments
  • Food processing equipments
  • Packaging machinery
  • Robotics and plotters

  • Reference Production

Our Service
 

Pre-Sales Service:

* Inquiry and consulting support. 

* Sample testing support. 

* View our Factory.

After-Sales Service:

* Training how to instal the machine, training how to use the machine. 

* Engineers available to service machinery overseas.

 


FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.


Contact Information

Lisa Ye
Export Department
Sanmen Binlong Transmission Belt Co.,Ltd.
 
 
Tel/Fax:0086-576-83313200
   
Website : binlongbelt.en.made-in-china.com 
   

Facebook: /binlongbelt


 

Product Tag:
Related categories:
Scroll to Top