GF Series Dry Air Generator is suitable for supplying dry air which keeps the power equipments' inner parts from moisture in the maintenance of transformer, reactor and other big power facilities. Maintenance staff will not be short of oxygen working inside the equipment. The Dry Air Compressor is more reliable, economic, convenient and safer than nitrogen.Therefore, it can shorten maintenance period and improve the efficiency of maintenance quality!To guarantee the performance of our equipment, all the main components we use are imported from Europe countries,such as vacuum pump and fine filter.
Parameters
GF Compressed Hot Dry Air Generator for Transformer drying and Maintenance
Item | Parameters | Unit | GF-60 | GF- 100 | GF- 200 | GF- 360 | GF-480 | |
Technical Parameter | Flow | M³/H | 60 | 100 | 200 | 360 | 480 | |
Working Pressure | Mpa | 0.6~0.8 | ||||||
Pressure Drop | Mpa | 0.05 | ||||||
Noise | dB(A) | <70 | ||||||
Working Power | KW | 380V-50Hz ,3 Phase 4 Wire | ||||||
Total Power | KW | 17 | 17 | 25 | 48 | 58 | ||
Size | Length | cm | 230 | 230 | 230 | 320 | 320 | |
Width | cm | 170 | 170 | 170 | 225 | 225 | ||
Height | cm | 235 | 235 | 235 | 240 | 240 | ||
Outlet pipe | DN | 40/50 | 40/50 | 40/50 | 40/50 | 40/50 | ||
Weight | Kg | 1200 | 1450 | 1600 | 1900 | 2200 | ||
After Treatment Index | Air Outlet Pressure | Mpa | 0.02~0.03 | |||||
Dew Point | ºC | -50 ~ -70 | ||||||
Particle | um | 0.01 | ||||||
Oil content in air outlet | ppm | 0.01 |
Packing and Shipping:
Our Services:
1. The warranty period is 12 months.
2. We supply repairing parts for product's life time long and technical instruction.( free within the warranty period and charge beyond warranty period).
3.All our products have been run well and have been adjusted to good state before go to market. Operator only need to do as the instruction manual by pulling the buttons and add right amount of additives. If some parts broken, operator just need to remove bolts and change new. Please note: the operation and repair is very simple.
4. When the machine send to your company . You can arrange your engineer to our company to learn operate the machine . We will arrange our engineer to teach your company engineer to operate the whole machine . You only need to pay your engineer to China the air tickets fee , hotel fee and food , It is ok !
5. We also can arrange our engineer to your country. You need to pay the air tickets fee , hotel fee ,food.