Wheelbase | 3225+1350 mm | |
Track | Track front | 2022 mm |
Track rear | 1830 mm | |
Cab | HW76 cab, 4-point full floating air suspension, adjustable steering wheel with various heights and angles, air suspension seat, central door lock, electric window lifter, power mirror | |
Engine | 1.WP12.400.12,400HP,Euro II emission 2.WD615.47,371HP, Euro II emission | |
Clutch | Sinotruks 430 diaphragm spring clutch | |
Gear box | Sinotruks HW19710 | |
Front axle | HF9 drum, rated loading 90000KG | |
Rear axle | HC16 Double reduction driving axle | |
Tire | 12.00-20 bias tire | |
Brae system | With ABS system | |
Frame | High-strength single U-profile frame with a section of 300*90*8 | |
Electrical system | 24V, CAN bus intellectual electronic control system |
Minimum order quantity? |
MOQ is 1 unit. |
Production period? |
(Truck & trailer) Within 30-55 days since the moment we got your down payment. (Spare Parts) Within 7 days since the moment we got your down payment. Besides in large quantities or imported |
Payment term? |
TT: 100% T/T should be paid before delivery (Truck & trailer) 30% T/T as deposit, the balance should be paid before delivery. or L/C. (Spare Parts) large quantities: 50% T/T as deposit, the balance should be paid before delivery, Or LC,Western union |
Shipping? |
(Truck & trailer) by container or RoRo/Bulk shipment. (South America, Middle East, Africa, Oceania etc.) by road or railway.(Russia, Mongolia, Kazakhstan, Uzbekistan , Vietnam, Laos etc.) (Spare Parts) Air transportation, such as DHL, TNT, UPS, or Fedex. Large value or Large quantity of goods, by sea or LCL |
After payment |
We will prepare the goods as soon as the financial notice money arrives.(It takes about two days for the money to arrive, excluding the weekend). We will take photos for you to confirm before the delivery, and then delivery to you |