Stamping Mold Progressive Pressing Tools Sheet Metal Stamping OEM ODM Punching Mould Factory with Favourable Price

Min.Order: 1
Product origin: Jinhua, Zhejiang, China
Infringement complaint: complaintComplaint
US$ 1000 ~ 50000

Description
Mould Image



Features of Progressive Tools
1. Progressive die is a multi-task sequential die. It can include punching, bending, deep drawing, forming and many other processes, so it has higher production efficiency than compound die, and can produce quite complex stamping parts.
2. Progressive die operation is safe because manpower does not have to enter the hazardous area.
3. In the progressive die design, process can be dispersed. Because the process does not have to be concentrated in the same station, there is no problem of "minimum wall thickness" in the compound mold. Therefore, the mold is relatively strong and has a long service life.
4. The progressive die is easy to realize automation, including automatic feeding, automatic output (material), automatic riveting; 
5. The waste of the progressive die will drop downwards, and the work piece will come out downward or exit from the side of the mold. Therefore, high-speed presses can be used for its stamping, such as terminal dies, high-speed dies etc. 
6. In general, one set of progressive die uses one press machine, so the use of progressive die can reduce the press quantity, workshop area, semi-manufactured goods transportation and storage area, and manpower required for stamping.


Other Mould Images




Factory View




Stamping lines:






Customer Reference


Packing&Shipping



Certificates

FAQ

Q: Are you a factory or trading company?
A: We are a factory which has been producing stamping machines for more than 35 years.

Q: What are your main products?
A: We specialize in manufacturing press machine, decoiler straightener and feeder, metal stamping die, transfer arms etc. ie, we mainly help customers contract to build the whole stamping line projects.

Q: What's the delivery time? 
A: The standard machine is 25 to 30 days after payment. If asked to supply whole production line by our customer, we will confirm the delivery time based on the specific project itself. 

Q: What's your payment term?
A: we advise 30% T/T deposit, balance paid before shipment.

Q: Do you receive OEM?
A: Yes, we warmly welcome customers to do OEM in our factory.
Product Tag:
Related categories:
Scroll to Top