Wheel Skid Steer Loader Mini Tractor Trencher Machine for Garden Work

Min.Order: 1
Product origin: Ningbo, Zhejiang, China
Infringement complaint: complaintComplaint
US$ 8000 ~ 11500

Description
Wheel Skid Steer Loader Mini Tractor Trencher Machine for Garden Work

YTO 4108 engine 60KW.Rated Loading weight 2000kg,bucket capacity1.0m³,220V engine preheater, adjustable steering, luxury seat, Mechanical joystick, Torque converter, four-wheel drive, bucket, with 16/70-20 tyres.Lock for lifting and steering cylinder.220V engine preheat,warning light,back sound,radio,fan,hand brake,extinguisher,window hammer,Easy damaged spare parts,tool box.    

DELIVERY TIME:20 days after deposit                                             
PAYMENT TERM:30% T/T payment in advance ,balance before shipment
PACKING STYLE:1 unit in 20ft container ,2 unit in 40HQ container  
WARRANTY:1 year From the date customer receive the machine

 
Specification
 
Engine model YTO4108 60KW
The minimum circle diameter310mm
Rated bucket capacity1.00CBM
Track base1500mm
Wheel base2350mm
Min. Turning Radius4600mm
Min. Ground clearance350mm
Dump height fully raised2800mm
Reach fully raised1050mm
Lifting time≤5.0s
Driving modeFour-wheel full hydraulic drive
Transmission gear box form2 gear hydraulic variable
speed changes
Operating weight5900kg
Dimension(L*W*H)5800*2000*2750mm
Maximum speed25km/h
Tyre type16/70-216/70-20









 
FACTORY


 
SAMPLE ROOM
 
 



Hot Products
ExcavatorSurface Finishing ScreedConcrete VibratorPower Trowel
 
 
 
 
Remote Control TrowelConcrete MixerPlate CompactorCompactor Machine
 
FAQ
1. Do you guarantee safe and secure delivery of products?
Yes, we always use high quality export packaging. We also use specialized hazard packing for dangerous goods and validated cold storage shippers for temperature sensitive items. Specialist packaging and non-standard packing requirements may incur an additional charge.
2. Can you supply the relevant documentation?
Yes, we can provide most documentation including Certificates of Analysis / Conformance; Insurance; Origin, and other export documents where required.
3. What is the average lead time?
For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times become effective when we have received your deposit, and we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do so.

 

Product Tag:
Related categories:
Scroll to Top