Stable Resistance Welding Machine for Auto Part

Min.Order: 1
Product origin: Guangzhou, Guangdong, China
Infringement complaint: complaintComplaint
US$ -1

Description
Stable Resistance Welding Machine for Auto Part
 

Parameter
Rated capacity660KVA
Power supply380V +-10%/ 3P/ 50Hz
Max. primary current230A
Duty cycle20%
Max. short circuit current84KA
Compressed air pressure0.6-0.7MPa
Max. working force60000N,(0.5MPa)
Equipment dimension(L*W*H)1750*1280*3671mm



Company Profile
Heron company was founded in 1991. During this 27 years, Heron has been dedicated in the R&D and manufacture of welding equipment , also the promotion of clinching system . Formed the standard products and customized two series of products.
And now, Heron has grown up to a larger scale company, with a plant over 56,000 square meters .
Heron's products have a wide application, which include automotive manufacturing, low voltage electrical, compressor manufacturing, household appliance manufacturing and motor manufacturing industry.
Besides, Heron also becomes a long-term supplier for many famous enterprises, such as Volkswagen, Benteler, Johnson Control, Emerson, Siemens, etc.  Meanwhile, Heron's products have been exported to overseas market, such as the United States, Canada, France, Italy, Poland, Brazil, Mexico, India, Egypt, Saudi Arabia ,etc.








Why choose us?
1. Found: Founded in 1997.
2. Company Scale: Registered capital: 48.5765 million RMB, about 400 employees, plant covers 56,000 square meters.
3. Business Scope: Professional manufactures whole series of resistance welding machines and completed metal connection intelligent equipment.
4. Enterprise Features: Continuous Innovation
5. Management Philosophy: People-oriented; Green manufacturing.
6. Certification: ISO9001, CCC, CE certification.
7. Application Industries: Automobile and auto parts, motor and generator, low-voltage electrical industry, compressor, household appliance and hardware Industry, BTM-L-Loc system and so on.


FAQ
1.What's the trade terms?
A: FOB, EX-Work, CRF

2.What's the payment term?
A: a. T/T 30% as deposit, 70% should be paid before delivery.
   b. L/C at sight

3. What's the delivery time?
A: 2-3 months after received 30% deposit.

4. What's the package way?
A: Wooden case

5. Which shipment port?
A: Guangzhou or Huangpu

6.How long is the guarantee?
A: For one year after customer received the machine. (It's not including the comsumables)


 
Our long-term clients





Quality control





 






Package & Delivery



 
Product Tag:
Related categories:
Scroll to Top