Quality Injection Plastic Bathtub Mold

Min.Order: 1
Product origin: Taizhou, Zhejiang, China
Infringement complaint: complaintComplaint
US$ 10000

Description
Product NameQuality Injection Plastic Bathtub Mold
Product materialPP
Core&Cavity Steel718
Steel hardness: HRC34-338
Mould StandardDME
Cavity Number1
Injection Systemdirect gate
Ejector Systemejector plate
Cycle Time58s
Tooling lead time60 days
Mould life500,000
Quality assuranceISO9001
 
Our Advantage1.High quality
2.Reasonable price
3.On time delivery
4.Good After-sale service
5.Strict quality control
6.All the mould are automotic.
 

Main QC Procedure
mould design control
mould steel certificated
mould steel hardness inspection
mould steel electrodes inspection
mould core and cavity steel dimension inspeciton
mould pre assembly inspection
mould trial report and sample inspection
mould pre shipment trial inspection
export mould package inspection.

FAQ:
 
1.How about your quality control?
We have professional QC team to control mold quality from raw material,machining to the final mould testing parts,as we realize that quality control is the first priority to run business successfully,and the Quality is the life of enterprise.

2.What's your lead time?
For most mold,normally 45 to 60 working days ( not including Chinese official holidays ) after deposit received and mold drawings approved.

3.How to approval samples?
1) You can come to our factory to see the mold testing directly.
2) We could send samples by DHL, TNT, Fedex, and we can send mold running video and molding parts dimension inspection report to you by email.

4.What about your after service?
1 year under normal use procedure,Spare part which is non-man made damaged will be offered for free within one year, and you can contact us at any time if you need help.







1.Samples/Drawing &Requirement from you
2.Mould design:we will Communicate&Exchange the opinion with you after you place order.
3.Material Purchase:Steel cutting and Mould base tooling. 
4.Assembling.
5.Inspection of mould : following and controlling the tooling processing.
6.Mould testing:We will inform you the date.Than will send the sample's inspection report&injection parameters with the sample to you!
7.Your instruction &confirmation for shipment.
8.Ready made mould before packing.


Main QC Proedure
Mould Design Control
Steel Certificated
Mould Steel Hardness inspeciton
Mould Electrodes inspection
Mould Core and Cavity Steel Dimension Inspection
Mould Pre-Assembly inspection
Mould Trial report and samples inspection
Mould Pre shipment final inspeciton
Export mould package inspection

Scroll to Top