Automatic Glass Bottle Beer Wine Soda Water Filling Bottling Equipment

Min.Order: 1
Product origin: Suzhou, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 10000 ~ 50000

Description
Product description:


Product Description

For filling carbonated drink contains washing, filling and capping mWith complete automation, suitable for filling carbonated drink into polyester bottles And PET bottles. It can be used for all kinds of bottles. The bottleneck blocking makes The process of changing bottles easily by only adjusting the height of conveyor chain.
The filling process adopts the micro-pressure technology, Which makes filling process faster and more stable

 
Main features

 
Model (CGFB) 8-8-316-12-618-18-624-24-832-32-1040-40-1250-50-1260-60-15
Washing head812182432405060
Filling head812182432405060
Capping head3686810121215
Capacity (500ml)2000bph3000bph6000bph10000bph13000bph16000bph20000bph24000bph
Voltage 380V/50Hz ; 380V/60Hz, 380V/50Hz, 220V/60Hz
Overall size L*W*H2000*1500*2200mm2200*1600*2200mm2500*1750*2200mm2950*2150*2200mm3720*2800*2200mm4180*3200*2200mm4720*3350*2750mm6000*5450*2750mm


Gas&beverage mixing machine
one tank



 
Capacity(kg/h)QHS-1500QHS-2500QHS-5000
Mixing ratio range wide(water:sugar)3:1-10:1
Gas contain quantity
(CO2H2O volume ratio)
>2.6
Cold cooling water entrance temperature(ºC)3-5
Pre-carbonization tank
syrup tank working pressure 
(Mpa)
0.05-0.08
Saving tank working pressure
(Mpa)
0.2-0.5
Power(kw)1.5kw2.42kw5.9kw
Overall size(mm)1200*1000
*1800mm
1500*1000
*2000mm
3000*2000
*3000mm
Weight(kg)600kg1000kg3000kg


Auxiliary machines




Production line technology flow:


Our workshop





1. Price period of validity: 60days 

2. Payment
30% deposit against the contract by T/T should be paid before the order;
70% balance should be paid off by T/T after inspection before delivery;

3. Delivery time 
30 days after received the down payment;

4. Training
Against the requests of the Buyer, the Seller's technician could train the Buyer's operators in the Buyer's factory in the periods of installing & adjusting;

5. Installation and adjustment
The Buyer should make a reservation in advance before delivery of the machines;
The Buyer should pay for the engineer's visa application cost, round air tickets, food & board before his departure; And pay USD 80/day to engineer.

6. Guarantee
one year

Competitive Advantages
Well and High Quality Control , 
Prompt Delivery ,long term testing before delivery
improve new technology all time
Customer's Design and Logo are Welcome , 
Competitive Prices , 
Earth-friendly Products , 
In a Variety of Design , 
Small Order Acceptable , 
ODM Accepted , 
OEM Accepted .


High quality: international brand electricity and good material
Our machines are using world famous brand component.
MITSUBISH PLC variable-frequency governor and OMRON optical switch form Japan.




Product Tag:
Related categories:
Scroll to Top