Description
Product Name:
Customized Injection Plastic PP Luggage Shell MouldProduct material PP
Core&Cavity Steel 2738
Steel hardness: HRC35-38
Mould Standard DME
Cavity Number SINGLE
Injection System DIRECT GATE
Ejector System EJECTOR PIN
Cycle Time 40S
Tooling lead time 60DAYS
Mould life More than 500, 000SHOTS
Quality assurance ISO9001
Our Advantage 1. High quality
2. Reasonable price
3. On time delivery
4. Good After-sale service
5. Strict quality control
6. All the mould are automotic.
Offer you In-time response on letters, telephone calls or fax
In-time supply the quotation and mould designs
In-time communication on the technical points
In-time sending pictures for the mould machining progress and mould finishing schedule
In-time mould test and sample delivery
In-time mould delivery.
For more information please contact us.
JSL Mould Quality Control
For the Q/C of mould, there are 3 steps:
1. Mould Material Q/C
- Mould Steel Checking(Hardness, flaw detection)
- Mould Standard Spare Parts Checking(hardness, size, flaw checking)
2. Mould Making Process Q/C
- design checking (part design, mould design, mould engineering drawing)
- checking each part of mould's size after machining, according to 2D drawing
- mould testing(check mould running condition)
3. Check with customer's requirement again before mould shipping.