Engine Housing Engine Block Vibratory Rust Removal Cleaning Degreasing Machine

Min.Order: 1
Product origin: Huzhou, Zhejiang, China
Infringement complaint: complaintComplaint
US$ 3000 ~ 5000

Description

Engine housing engine block vibratory rust removal cleaning degreasing machine

Catalog Download

https://inovatecmachinery.en.made-in-china.com/Product-Catalogs/

Tub Vibrator Product Description: 

Tub vibrator also called as rectangular vibratory finishing machines. TVB(A) series vibratory tubs are perfect for large and heavy parts vibratory tumbling, for example, ceramic coated headers, exhaust pipes, engine housing. In some applications, it also called Ceramic Polishing Machine.

This curved wall offers strengthened tumbling performance and reduces process time. In addition, the featured lining well suited for ball burnishing process. TVB(A) model features heavy gauge all welded steel construction.


 

Application includes: tumble deburring plastic , tumble finishing , barrel finishing

 Tub Vibrator Feature: 

  • Digital process timer
  • Low profile design
  • Wide opening for big size parts
  • Stress relieved and enhanced with blasting
  • Default manual parts media separation
  • Extended separation deck
  • Wear resistant PU lining from Dow Chemicals


 Tub Vibrator Optional setting: 

  • Optional Items
  • Sound Cover
  • Compound Dosing Pump
  • Pneumatic flap control
  • Variable Frequency Drives
  • Control box standing on the floor or hang on the wall



 Tub Vibrator Technical Drawing: 






Tub Vibrator Technical Data: 

 Tub VibratorTVB(A)240TVB(A)500TVB(A)750
Total volume(L)240500750
Max overall dimension LXWXH (mm)1880×880×9202870×880×9203354×880×920
Chamber length  C (mm)69013102000
Chamber height  B (mm)625625625
Chamber diameter  A (mm)670670670
Feeding entry width  W (mm)524524524
PU Lining thickness(mm)161616
Power(km)1.1×22.2×22.2×2
Weight(kg)45010001600

 Tub Vibrator Product info: 




Surface Finishing Metal Deburring Company introduction:





Vibratory Finishing Equipment Optional settings: 





Vibratory Deburring and Polishing Successful Project: 





Parts before and after vibratory polishing, vibratory deburring, cleaning, edge rounding, descaling, degreasing, de-oiling, cleaning, edge breaking,radiusing




Mass Finishing Equipment and Ceramic Media Packing and shipment: 




Payment:





FAQ:


Q: How is Inovatec machinery brand?
Inovatec Machinery is famous Top 3 brand mass finishing equipment and consumables manufacturer of China, has:
- 25 years: vibratory finishing machines and tumbling media manufacturer experience.
- 20000 square meters factory
-2 year warranty


Q: What Certifications do you have?
ISO9001, CE, certifications etc. 100% quality check, and testing before shipment.


Q: What is Inovatec Machinery equipment warranty?
2 year warranty for all Inovatec Machinery equipment
Lifetime maintenance will be provided after the 2 year warranty period expires.


Q: How you guarantee tumbling media quality?
We make quality tracking from raw material until quality check before shipment. We keep record of quality test including wearing and cutting.

For bulk and OEM order, we follow your testing methods and keep track of wearing and cutting. If the quality does not meet the standard, we will not make the shipment.

Q: What is your Payment method?
Accept payment via T/T (Bank transfer), Western Union, Money Gram, and PayPal;
Accept L/C at sight (bulk order).


Q: What is your Minimum order amount?
For machine minimum order is 1 PCS. For tumbling media minimum order is 1000kg or 2000 lbs as one pallet.

You can ship less amount of media if ship with the machine.
Sample order is allowed to ship less amount of tumbling media

Q: What is your way of packaging?
Fermentation wooden pallets for media, 1000kg per pallet, 25kg/plastic bag
Customize packaging and logo printing is available for discuss
Wooden box for equipment and compound

Q: How long is your production time?
15 working days for sample order;
20-25 working days for bulk order.

Emergency order can be fulfilled in a week

Q: What is the Shipping Way?
20-30 days by sea to your nearest seaport
2-5 days by air to your nearest airport
3-5 days by express to your doorstep


Q: What is the nearest Port:?
Shanghai, Ningbo and Yiwu are the closest port.


Contact us: 

 

Product Tag:
Related categories:
Scroll to Top