Yc-Lok Steel Single Handed and Semi Automatic Type Quick Couplings

Min.Order: 100
Product origin: Zhenjiang, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 2.7 ~ 21.6

Description

1.Product Name:

YC-LOK Steel single handed and semi automatic type quick couplings

2.Description:

Material: Stainless Steel/ Carbon Steel/ Brass
Technique: Forged
Type: Tube Fittings
Place of Origin: Jiangsu, China (Mainland)
Brand Name: YC-LOK 
Connection: Thread
Shape: Equal
Head Code: Hexagon
OD Size: 1/16''-1'' ,3mm-25mm
Structure: union,elbow,tee,cross,bulkhead,male or female connector
Working Pressure: up to 6000ps (low/medium/high/very high)
Medium: water, oil, gas, acid ,base and so on
Special Treatment: ferrule hardness treatment
Nut Treatment: silver planted
Tube Treatment: fully annealed
Inner Cone: mirror polishing processing
Working Temperature: -20 to 200 Celsius degree
Power: hydraulic
 
3. Packaging & Delivery
1.Packaging Details:1. Wooden box
2. Carton
3. As your request. 
2.Delivery Detail:Shipped within 15~30 days after payment
3.Logo:Any logo is available
4.MOQ:100 pcs
5.Samples: Free
6.OEM Accepted Yes
7.Production Capacity:10,000pcs Per week
8.Payment Term:(1) L/C,T/T,D/P,D/A,PAYPAL,WESTERN UNION,MONEY GRAM












Contact Us:
Jiangsu Yicheng Fluid Equipment Co.,Ltd
Jason Gao


FAQ:


Q1.Can I get free samples?

A: Yes,we can provide you the free sample, but you need to bear their own delivery costs.
 
Q2. Can I have a sample order for fittings?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.


Q3. Are you a trading company or a manufacturer?
 A: We are a manufacturer.

Q4. What is your payment term?
 A:Normally T/T 50% in advance, balance to be paid before delivery.

 Q5: What is your main market?
 A:North America,Greenland,South America,Africa,Southeast Asia, Former Soviet Republics ,East Asia,and Europe.

 Q6:What kind of trade terms can you do?
A:EX-WORKS,FOB,CFR,CIF,etc.

Q7. What about the lead time?
A:Sample needs within 7~15 days, mass production time needs within 20~35 days.
Product Tag:
Related categories:
Scroll to Top