Description
Product Name | Hot sale customized metal aluminum anodizing blank credit card with rounded corners |
Available Materials | Metal Parts: aluminum,steel,brass,copper,iron, etc. Plastic Parts: PC, PP, ABS, PMMA, PA, POM, PC+ABS, rubber, etc. |
Surface treatment | Anodizing,sandblast,brush,powder coat, oil painting, polishing, PVD/CVD coating, galvanized, electroplating, plating(nickle,silver,gold...), spraying, laser etching and so on |
Drawing Format | DWG/DXF, IGS/STP/STEP, PDF, etc. |
Lead time | 15~30 days after confirming samples |
Shipment term | FOB,CIF,EXW by sea/air, by express( DHL/UPS/TNT/FedEx) |
Certificate | ISO9001:2008,ROHS, SGS,TS16949 |
Manufacturing Type | Auto lathe,cnc lathe,drilling machine,cnc milling machine stamping machine,wire cutting machine Universal spring machine, thread rolling machine,taping machine,automatic knurling machine,head molding machine,thread chipping machine cleaning machine grinding machine |
1.Q: Are you a manufacture or trading company?
A: We are a China Enterprises which has 16year-manufacturer in hardware products.
2.Q: Do you provide ODM/OEM service?
A: OEM / ODM is welcome, We got a professional and creative R&D team, and customized colors are optional. From the concept to finished goods, we do all ( design, prototype reviewing, tooling and production ) in the factory.
3.Q: Where is your factory located? How can I visit it?
A: Our factory is located in Dongguan, Guangdong, Dongguan is the Closest city from Shenzhen and Guangzhou, hongkong. 1 hour from Guangzhou and shenzhen by car. 1.5 hours flight from Hong Kong ( 1 hour by car+0.5 hour by boat ).
4.Q: Is it possible to know how are my products going on without visiting your company?
A: We will offer a detailed production schedule and send weekly reports with digital pictures and videos which show the machining progress.
5.Q: How can I get the sample? What's the lead time?
A: Normally will be send in 7days. If need to open new Model, need another 10-15days more.
6.Q: What's the lead time for mass production?
A: 20-25days after down payment confirmed, can be negotiable.
7.Q: If you make poor quality goods, will you refund our fund?
A: As a matter of fact, we wont take a chance to do poor quality products. Meanwhile, we manufacture goods quality products until your satisfaction.
8.Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock, or it is 15-30days if the goods are not in stock, it is according to quantity.
9.Q: Do you provide samples? is it free or extra?
A: Yes, we can provide samples, but need few samples charge, we need custom to do.
10.Q: What is your terms of payment?
A: Payment<=1000 USD,100% in advance. Payment>=1000 USD, 30% deposite, balance before delivery, 70% balance pay before delivery.
11.Q: How to order?
(1) You send us drawing or sample;
(2) We carry through project assessment;
(3) We give you a design;
(4) You think the design is ok;
(5) We make the sample and send it to you;
(6) You think the sample is good then place an order and pay us 30% deposite;
(7) We start to make the product;
(8) When the goods is done, we deliver it to Shenzhen Yantian;
(9) You pay us the balance after you see the B/L Copy;
(10) The whole order is done, thank you!!!
How to contact us?
Send your inquiry Details in the Below, Click "Send" Now......