Sy-N04504 Nurse Training Electronic Male/Female Urethral Catheterization and Enema Manikin

Min.Order: 1
Product origin: Guangzhou, Guangdong, China
Infringement complaint: complaintComplaint
US$ -1

Description
SY-N04504 Nurse Training Electronic Male/Female Urethral Catheterization and Enema Manikin

Feature of Electronic Urethral Catheterization and Enema Manikin:
1. Male urethral catheterization: Lift the penis, simulating extending the urethra bend (curvatura prepubica). Gently introduce the catheter into the meatus and slowly advance it through the urethra (through cavernous body of urethra, membranous urethra and prostatic urethra). If the operation is correct, the green light will power on. Advance the catheter about 18~20cm and the red light will power on.The return of urine into the collection tubing signifies that the catheter is in the proper position.
2. Female urethral catheterization: Gently introduce the catheter into the meatus and slowly advance it proximally 4cm through the urethra. The catheter will arrive at bladder and the red light will power on. 
3. The return of urine into the collection tubing signifies that the catheter is in the proper position. 
4. Enema: Introduce the catheter into the anus and advance it about 10cm through the anal canal.

Picture of Electronic Urethral Catheterization and Enema Manikin:




 

Main products:



FAQ:

Q: How to purchase your products ?
A: You can contact with us and purchase from our company directly. Normal procedure is: offer, sign contract, payment and shipment.
 
Q: What's the warranty for the products ?
A: The free warranty is one year from the date of commissioning qualified. However, we will still provide good after-sales service after warranty period.
 

Q: Can we visit your factory ?
A: Of course, welcome to visit our factory if you come to China.
 
Q: How long is the validity of quotation ?
A: Generally, our price is valid within one month from the date of quotation. The 
price will be adjusted appropriately as the price fluctuation of raw material in 
the market.
 
Q: What's the production date after we confirm the order ?
A: This depends on the quantity. Normally, for the mass production, we need about 
7-10 days to finish the production.

Product Tag:
Related categories:
Scroll to Top