Description
Wasinex Water Pump Adjustable Pressure control switch Technical parameters:Starting Pressure | 1bar-3bar |
Max Rated Current | 10A |
Maximum power | 1.1kw |
Max Allowable Pressure | 10bar |
Rated Voltage | 110V or 220V |
Frequency | 50/60HZ |
Max Ambient Temperature | 40ºC |
Max Liquid Temperature | 60ºC |
Protection Rating | IP65 |
Description of Products:- Stop and start the pump automatically.
- Stop the pump in the case of water shortage automatically.
- After power cut off, it can restart the pump automatically once the power is back on
- Forced start.
- Connection thread: G1".
Optionals- Optional models and function
A: DSK-5, Starting pressure: 1.2 bar, 1.5 bar, 2.2 bar
B: DSK-5C Automatic restart after water shortage. The starting pressure is 1.5 bar, automatic restart after shortage, the restart interval time is 8S, 30S, 1 hour, then 1 hour recycle, and the running time is 8S.
C: DSK-5A with European plug, starting pressure: 1.2 bar, 1.5 bar, 2.2 bar
- Color.
- Connection thread: G1".
- The length of power line.
FAQ:Q: Are you manufacturer or trading company?A: We are professional manufacturer of Pressure/ Level/ Temperature transmitters,water pumps,inverters,press controlers,electronic switches etc. We provide high quality products with high competitive factory price.
Q: What's your quality control system?A: We have strict quality control system, and each product is done fatigue testing, calibration, temperature compensation before shipment. High quality is guaranteed.
Q: Is there MOQ with your product?A: We have no MOQ limits, 1pc for testing purpose is acceptable.
Q: Can we print our logo on the products? Do you provide customized products?A: Yes, we can print your logo on our products; OEM, ODM&customization are welcomed.
Q: What is the warranty of your products? And after-sales service?A: Our warranty time is 12 months after shipment, and our after-sales dpt will respond with your questions in 24hrs, remote instruction by PC network is always available.
Q: What is lead time of your product?A: We are factory, our lead time is always within 10 working days for products without customization.
If you have any demand for inverter,pressure control switch and VFD water pump,welcome to contact me. Website :http://wasinex.en.made-in-china.com