Structural Steel Industrial Construction Steel Structure with Insulation Panel Quotation

Min.Order: 10
Product origin: Dezhou, Shandong, China
Infringement complaint: complaintComplaint
US$ 755 ~ 780

Description
Steel Structure Building Factory Constructor Builder In China

Description

Steel structure workshop included the main structure (steel beam/girder, steel column/pillar), the secondary structure( roof and wall purlin, steel bracing, tie-bar etc), door and windows, and other accessories.




Contact Me For More Photos Free Design And Best Price
Choose Xinmao,Choose Right

Application

Inidustry: Wokeshop, warehouse, and other industry facilities.
Commerce: Mall, hotel, exhibition hall, office building.
Public: School, library, sports stadium, churce, etc.

Learn More Specification


Item Name
Specification
Main Steel Frame
Steel Column
Q235B, Q345B : H shape, Box, Steel pipe, Hot rolled sheet
Steel Beam
Q235B, Q345B : H shape, Steel Truss, Hot rolled sheet
Supporting System
Brace
Q235B, Q345B : Steel rod, Steel pipe, Angle steel
Roof Purlin
C or Z shape, Steel purlin
Wall Purlin
Q235B, Q346B: C or Z shape, Steel purlin
Roof
Single colorful corrugate steel sheet, Sandwich panel with EPS, Rock wool, PU, Glass wool
Wall
Single colorful corrugate steel sheet, Sandwich panel with EPS, Rock wool, PU, Glass wool
Accessories
Bolts
Ordinary, High strength
Gutter
Galvanized Steel plate, Stainless steel
Windows
Aluminum alloy-Glass, Aluminum alloy-shutter, PVC
Doors
Sliding or Rolling door
Downpipes
PVC pipe, Color steel pipe
Edge Cover
Made of color steel sheet thickness 0.5mm
Ventilator
Stainless steel
Crane
Crane in 5 tons to 20 tons
Good Materials Make Good Quality

Steel Structure Process:

1. Prepare raw materials : cut steel plate or use internation size H section steel and angle steel, round tube, round steel, square tube etc.;
2. Assembly and welding: our welders will follow the drawings to assemble the steel members and weld them together as a entire beam/column/brace and so on; (Our quality inspector will check the steel pieces after finish welding, this is the first quality check)
3. Sand blast : After finish welding and polishing, our sand blast effect can reach internation 2.5 high grade, very good for resist rust; (Secondary quality check)
4.Paint : Within 2 hours after sand blast, all the steel members should be paint. Client can choose any color and any brand of paint. (The third quality check)
5. Inspect the goods by client : After we finish a part of fabrication work, we will invite clients to check the goods before we pack the steel frame.
6.Packing and loading : If clients require us to load the goods by close containers, we will pack the steel structure members one by one on the steel skid and tie the whole steel package well. (The fourth quality check )

Packing And Delivery

Load to a steel pallet for easy loading and unloading ,meanwhile protect the goods from damaging .

Main steel frame without packing load in 40' OT, roof and wall panel load in 40' HQ! Or according to customer's requirement


Installation
We provides customers with one-stop integrated housing solution including installation and operation.
Engineers and workers can be sent abroad for guidance and installation.


Buyers Feedback


Certification
Product Tag:
Related categories:
Scroll to Top