Portable Small Vortex Hydro Power Generator 220V 15kw

Min.Order: 1
Product origin: Chengdu, Sichuan, China
Infringement complaint: complaintComplaint
US$ 18880

Description

Portable Small Vortex Hydro Power Generator 220v 15kw

A Pelton turbine or Pelton wheel is a type of turbine used frequently in hydroelectric plants. These turbines are generally used for sites with heads greater than 300 meters. This type of turbine was created during the gold rush in 1880 by Lester Pelton.
When used for generating electricity, there is usually a water reservoir located at some height above the Pelton turbine. The water then flows through the penstock to specialized nozzles that introduce pressurized water to the turbine. To prevent irregularities in pressure, the penstock is fitted with a surge tank that absorbs sudden fluctuations in water that could alter the pressure.
Unlike other types of turbines which are reaction turbines, the Pelton turbine is known as an impulse turbine. This simply means that instead of moving as a result of a reaction force, water creates some impulse on the turbine to get it to move.



Pelton Hydro Turbine Product Features 
1.suitable for high head,small flow and flow changes in large runoff hydropower station.
2.With the power plant investment is small,compact units structure characteristics.
3.Has the efficiency changes smoothly,operating a wide range,even in the 15--20% load is reduced efficiency.
4.Suitable for high head,small flow station in mountainous area.
5.A unit construction,simple restrictions without cavitation condition,the advantages of stable operation,less investment,construction area.




Pelton Hydro Turbine Product Parameters:

 Pelton tubine generator unitGeneratorUnit output (kw)
Turbine
TypeWater head(m)Discharge (m³/s)Output(kw)Speed (r/min)TypeCapacity (kw)
CJA237/475-1*72000.232383.2750SFW320-8/850320358.3
2200.243440.5SFW400-8/850400414.1
2400.254502SFW500-8/850500474.4
2600.2645721000SFW500-6/850500540.5
2800.274643.5SFW630-6/990630608.1
3000.284714.6SFW630-6/990630675.3
CJA237/475-W-90/1*4.52750.086176.3750SFW160-8/650160162.9
3000.0896200.4SFW200-8/740200185.8
3250.0932225.8SFW200-8/740200209.3
3500.0969252.8SFW250-8/740250235.1
3750.1005279.8SFW250-8/740250260.2
4000.1033091000SFW250-8/740250287.4
4250.1077341.3SFW320-6/740320320.1
4500.1098368.4SFW320-6/740320345.5
5000.119496SFW500-6/850500456
6000.131650SFW630-6/990630610
7000.141823SFW800-6/990800770
CJA237/475-W-90/1*72600.261572750SFW500-8/850500526
2800.271636SFW630-8/990630585
3000.28700SFW630-8/990630651
3200.289766SFW800-8/990800712
3400.298834SFW800-8/990800775
3600.307899SFW800-8/990800836
3800.315968SFW1000-8/11801000900
4000.32710931000SFW1000-6/118010001021.9
4200.3351159SFW1000-6/118010001189
4400.3431287SFW1250-6/118012501203.3
4600.3511382SFW1250-6/118012501292.2
4800.3591476SFW1250-6/118012501380.1
5000.3661567SFW1600-6/118016001465.


Company Information

Our workshop

FAQ

Q1, Which turbine should I choose?
 Please tell me the water head, flow rate, frequency, Total power you need, voltage, on grid or off grid operation, 

Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment,upgrade, improvement, repair,refurbishment of turbines,generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?
 For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7,Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.  

website address: cdforster.en.made-in-china.com

Product Tag:
Related categories:
Scroll to Top