Anodizing Aluminum Metal Fabrication Welding Work

Min.Order: 5,000
Product origin: Suzhou, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 0.3 ~ 0.5

Description

Anodizing Aluminum Metal Fabrication Welding Work

Products

 Fabrication Service Stamping / Punching, Bending, Welding, Laser Cutting, Sheet Metal, etc
 Other Type Rapid Prototyping, Etching / Chemical Machining, Laser Machining, Broaching,   Wire EDM, Milling, Turning, Drilling
 Tooling/Molding Continuous Mold, Single Mold

 OEM & ODM 

 Standard or Non-Standard 

 Available, Customization, Non-Standard

 Drawing Format Required Auto CAD(IGS, STP, STL and X-T), DWG, PDF, Pro/Engineer, SolidWorks, etc
 Materials Spring Steel, Stainless Steel, Brass, etc
 Thickness 0.3 -1.2 mm
 Surface Finish Heat Treatment, Plating, Degreasing, Electrophoresis, etc
 Tolarence Control +/- 0.03 ~ +/-0.05 mm
 Certificates ISO 9001:2015, IATF 16949:2016, PPAP, ROHS, BV, CCC, etc 
 Sample Time  5 -7 Days
 Supply Capacity 600,000pcs ~ 800,000pcs / Week
 MOQ Accept 1pcs sample
Inspection 100% Inspection 
Fabriction Service Experience More Than 26 years
 Project Solutions For

 

 [Successfully Passed Factory Inspections of Many Well-Known Companies]


Customizing



 


 

 

Jun Ping JuOwner18+ years in metal parts fabrication engineering experience 
Ivy DingVice president10+ years in metal parts fabrication. Specialized PMC scheduling 
Jian LuEngineering Manager12+ years engineering experience in metal fabrication 
Tina LinPM Manager 8+ years PM experiece in metal parts projects 
Ruitian HuangQuotation Engineer15+ years in metal parts cost analysing. Specialized in tooling and products cost optimizing 



FAQ

Q: Are you trustful? 

A: This is the 26th from startup of this commpany and the 10th year listed in alibaba offical system. You are welcomed to require any profile of this company from Alibaba offical. 

 

Q: How about your engineering skills?

A: We deserve a sample try based on our past successful project experience

 

Q: How about costing?

A:  Our costing is based on material/labor/overall/profit. We are well managed factory. No middleman cost added.

Q: How about the Delivery time?

A: Generally it is 5-10 days for samples and15-20 days after molding or sample confirmed.

Q: How about your commmunicaiton skill?

A: We are a team full of experience with worldwide customers. You dont feel worry about your project management and the logistics.

If you have any other question, please feel free to contact us!

 

Product Tag:
Related categories:
Scroll to Top