Membrane Separation Biogas Upgrading Decarburization to Natural Gas

Min.Order: 1
Product origin: Changsha, Hunan, China
Infringement complaint: complaintComplaint
US$ -1

Description



After two-stage desulphurization processes, then go through our GasDec system (Membrane Separation) for carbon removal, biogas could be upgraded to make CNG, for vehicle or going into national pipeline network.

The gas quality after upgrading as below:
ItemQuality IndexComments
High thermal valueMJ/m3>31.4In the specific geographical area for vehicle driving, under the highest operation pressure, the water dew point shouldn't be higher than -13 degree.C; When lowest ambient temperature lower than -8 degree.C, the water dew point should be 5 degree.C lower than the lowest temperature.
CO2%≤3.0
Total Sulfurmg/Nm3≤200
H2Smg/Nm3≤15
O2%≤0.5
Comments: The above data is subject to clients' actual requirements.

Procedures of our biogas upgrading system:

 
1, Primary Filter
The saturated water and partial particles in the raw digester gas are removed through the primary filter;

2, Boosting, Primary desulphurization
The biogas from primary filter is boosted by blower. Then after cooling, the biogas is fed to wet type desulphurization system for primary removal of Hydrogen Sulfide, to make H2S content lower than 200 mg/Nm3;
 
3, Fine desulphurization
The content of Hydrogen Sulfide is made lower than 50 mg/Nm3 through dry type desulphurization system;
 
4, Impurities Removal, Fine Cleaning System
The new dust and impurities in biogas could be removed through the Separator; Then delivered to Fine cleaning system for removals of water and tiny particles in order to protect membrane and guarantee its life-time;

5.  First MS (Membrane Separation)
The high quality compressed biogas goes into the first MS system through gas-distributing pipeline. The exhaust gas could be gathered or discharged into atmosphere;

6.  Secondary MS (Membrane Separation)
The gas out of First-MS goes into Secondary MS system for final decarburization. The exhaust gas would totally return to the inlet of biogas compressor. Thiophane is added into the cleaned gas, after CNG compressor, through dispenser, to be delivered to gas station by tank lorry;

Main equipment list of our upgrading system:

1.  Main non-standard equipment
ItemEquipment NameSpecificationsQtyComments
1Primary Filter 1Unit 
2Primary Cooler 1Unit 
3Wet Desulphurization Tower 1Unit 
4Secondary Filter 1Unit 
5Dry Desulphurization Tower 1Unit 
6Separator 1Unit 
7Pregnant Groove 1Unit 
8Regeneration Groove 1Unit 
9Barren Liquor Groove 1Unit 
10Sulfur Froth Groove 1Unit 
11Underground Groove 1Unit 
12Fine Cleaning System 1 Set 
13First MS Assembly 1 BatchImported
14Second MS Assembly 1 BatchImported
15Buffer Tank 1 Unit 

2.  Main Operation Equipment List
ItemEquipment NameMaterialQTYComments
1Biogas BlowerCase Iron2 UnitsWith back-up
Anti-explosion
2Desulphurization PumpCase Iron
+SS304
2 UnitsWith back-up
Anti-explosion
3Regeneration PumpCase Iron
+SS304
2 UnitsWith back-up
Anti-explosion
4Sulfur Froth PumpCase Iron
+SS304
2 UnitsWith back-up
Anti-explosion
5Supplement PumpCase Iron
+SS304
1 UnitAnti-explosion
6Biogas CompressorCase Iron1 UnitAnti-explosion, Variable frequency
7CNG CompressorCase Iron1 UnitAnti-explosion, Variable frequency
8Gas Dispenser 1 UnitSingle line, Double nozzles & measuring
9Gas Odorization 1 Unit 

3.  Instruments & controlling
ItemProduct NameQTYComments
1PLC Controlling Cabinet1 set 
2PLC system1 set 
3Operator Station2 units 
4Complete On-line UPS1 unit 
5Flow-meter2 units 
6On-line analyzer2 units 
7Pressure transmitter1 batch 
8Pressure gauge1 batch 
9Temperature gauge1 batch 
10RTD1 batch 
11Alertor1 batch 
12Electrical control box1 batch 


Scroll to Top