Product Name: | Forging Parts |
Manufacture Process: | Design-Forging Processing-CNC Machining-Inspecting-Packing |
Main Material: | Aluminium,Brass,Steel,etc. |
Color: | Custom Color |
Finish: | Clean/Polish/Anodized/Custom Surface |
Production Equipment: | 1) Forging Machine 2) CNC machine 3) Polishing machine |
Processing time per piece: | Various |
Measuring Instruments and Equipment: | 1) Micrometer 2) Smooth plug gauge 3) Thread gauge 4) Image measuring instrument 5) Coordinate Measuring Machine 6) Roughness tester 7) Routine inspection of calipers |
Tolerance: | ± 0.05~0.100 mm |
Quality control: | ISO 9001:2008 & IATF 16949 |
Sample time: | 1-3 days |
Service: | Customized OEM/ODM |
Shipment: | Fedex, DHL, UPS, Sea or Air Shipment, etc. |
One-stop Service: | Custom Design, Fabrication, Assembly And Delivery |
File Format: | Solidworks,Pro/Engineer,Auto CAD,C4D,Creo,PDF,JPG,DXF,IGS,STEP,DWG |
As a leading mechanical parts supplier in China, our producing capability is as below:
Forming | CNC, plastic injection molding,cold extrusion, forged, stamping, die casting., etc |
Material | Aluminum alloy,plastic,bronze, copper, brass, steel.,etc |
Surface Finish | Anodize, Sandblasting, Heat treatment, polishing, powder coating, electroplating, dacromet., etc. |
Other Process | Laser welding, hot press, gluing.,etc |
Inspection | color inspection, hardness, impact, Tensile strength.,etc |
FAQ | Q: Can you do customized design and size? A: Yes, ODM & OEM are available. Q: Can I have some samples? A: Of course, stock samples are free. Lead time: 2-3 days. Customized samples: about 7-10 days. Q: How long is your production lead time? A: The goods will be finished within 3-35 days after sample confirmed. Q: What is your MOQ?
Q: Which payment way is workable? A: Small amount: PayPal, Western Union, Cash. Large amount: T/T, L/C, DP and OA.
Q: How is your after sales service? A: 1. Your comments and feedback are important to us; 2. If any damage or defect goods you found, after necessary checking, if it's our fault, we will take full responsibility to compensate the loss. |