Agricultural Machinery Garden Tools 25.4cc Brush Cutter with Multi-Function 4 in 1

Min.Order: 100
Product origin: Jinhua, Zhejiang, China
Infringement complaint: complaintComplaint
US$ 20 ~ 95

Description
Model No.:KE-MT260BKE-MT330BKE-MT430BKE-MT520B
Engine Type:2 stroke, air-cooling2 stroke, air-cooling2 stroke, air-cooling2 stroke, air-cooling
Displacement:25.4cc    32.6cc42.7cc51.7cc
Rated Power:0.75kW1.0w1.25kw1.45w
Fuel Capacity:0.6L0.8L1.0L1.0L
Fuel & Oil Ratio:25:1    25:1  25:1  25:1  
Working Pole Dia.:26mm26mm26mm26mm
Weight:12kg13kg14kg14.5kg

Compared to Electric and Lithium-battery machinery, petrol power is more convenient for use because it has no distance limited and no need to wait for battery recharging in case you forgot to charge in advance.
Furthermore, petrol engine is much reliable,longer-life and powerful than motor.


Built professionally for dynamic power and high efficiency;
Two-handle operating mode to improve safety and reliability;
Automatic releasing strap design improves operation safety;
Various metal blade size for a wide range of use;
Quickly and easily changing metal blades and nylon cutter;
Multifunctional machine, suitable for different occasions.


FAQ:
 
Q: Are you a factory or trading company?
A: We are a factory. We have 9 years experience in this field. "Jinhua HongLong Electrical Technology Co., Ltd" is on behalf of our factory for all imp&exp business.
 
Q: What's the Warranty for your products?
A: We provide a 1-year warranty for all items.
 
Q: How does your factory do regarding quality control?
A: Quality is the priority. Our inspection team always pay great attention to quality control from the very beginning to the end of the production. Every product will be fully assembled and carefully inspected before shipment.
 
Q: Do you provide samples?
A: Yes, but samples fee and freight fee will be charged.
 
Q: What's your MOQ?
A: Different MOQ for different models and different seasons. We can negotiate about it by then.
 
 
Q: What's your delivery time?
A: Normally 30-35 days are needed after receiving deposit or L/C. In peak seasons, the delivery time will be longer.
Product Tag:
Related categories:
Scroll to Top