Electrically Operated Movable Sliding Wall with Single Point Suspension Pivot Partition Door

Min.Order: 40
Product origin: Guangzhou, Guangdong, China
Infringement complaint: complaintComplaint
US$ 960 ~ 1620

Description
Electrically operated movable sliding wall with single point suspension pivot partition door

This kind of electrically operated movable sliding wall with single point suspension is not only slidable, each door is also to 90 degrees rotatable. When the doors are only rotated, then be used as the partition door. The partition walls can also be slided to stacking area, make the configuration of space flexibel and neaty.



Panel Height   Minimum 3500mm, Maximum 16000mm
Panel Width    Minimum 750mm, Maximum 1200mm 
The bearing weight of track up to 450kg/m 
Acoustic Rating 30-50db

Sound insulation material: Below 47 dB, fire-proof sound insulation cotton, 80-120KG/M³;      
47 dB or above: 1.2mm-1.5mm double-sided steel plate and fire-proof sound insulation cotton100-150KG/M³

Basal panel: 12mm thick MDF board or Glass-mg board, colour steel board, melamine board and fire resistant plasterboard.

The look and form of Partition wall: The tracks and outer frames are coated with 6063-T6 high hardness white electrostatic powder.

Track and pulley configuration: Equipped with automatic electric retractable mechanism with spring support and multidirectional track or straight one-way track and trolley bearing.

Designed to suit all applications the range is suitable for use in areas where flexibility is equally as important as performance, for instance:  
» Office interiors and meeting rooms 
» Conference and function suites
» Sports and leisure facilities
» Education establishments
» Exhibition centers
» Hotels and restaurants
» High clean factories


 

Why choose our CN Fully Automatic Sliding Partitions 

Fully automatic partition operating system

Quick and easy spatial adaptation in prestige and commercial environments
The fully automatic partition offers outstanding convenience in flexible space utilisation. At the push of a button it enables offices and conference room to be adapted quickly and efficiently to daily changing requirements. With this system, multi-funtional space management is a truly simple affair. 

Advanced technology  
The partition elements can be moved to their individually preprogrammed position and their sealing strips extended or retracted under fully automatic control. The control interface takes the form of a user-friendly touch screen. Safety is ensured by an integrated monitoring system that stops the partition motions the moment contact is made with an obstacle.  

Operating behavior

Operating modes

In all operating modes, the partition elements are moved to their preprogrammed positions under fully automatic control. The system operating behaviour can be adjusted by parameter reconfiguration. 

Acceleration:
As soon as an element receives the command to go, it checks to ensure that the way ahead is free and then accelerates to the programmed speed.

Fast speed:
If the way ahead is unimpeded over a good distance, the element is accelerated to the highest speed of travel.

Creep speed:
The element switsches to creep mode to travel the final few centimeters to its preprogrammed position.

Deceleration:
As the element approaches its preprogrammed position, the speed is reduced to the required creep value.

Stop:
The element stops once it has reached its preprogrammed position. The top and bottom sealing strips are extended.

Staggered travel mode:
The element follows the proceding element at a defined distance as they move into their respective positions.

Waiting:
Elements receiving the command to go remain in the waiting mode until the way ahead is free.

 

Movable Walls manufacturer custom-made wall partitions to meet various needs

We service all types of operable walls, room dividers and acoustical divider partitions. 
Because movable partition walls are customized products. Each place has different sizes, we make steel framed operable walls and moveable partitions of a variety of materials depending on the application for sound transmission, durability, aesthetics, cost and function.
We listen to your goals, understand your needs, provide one-on-one private custom services, make recommendations according to your actual situation, provide professional design and contractor to coordinate building codes, structural and electrical requirements.  


Service process

1. The client provides architecture drawings and indicates the location and extent of the partitions/doors. We will make design scheme and quotation according to the customer's site and requirements.

2. The client confirms the design scheme and quotation. We will arrange production after payment received according to agreement.

3. We will clearly mark packages and panels with numbering systems used on Shop Drawings, Packed in accordance with international export requirements, assist the customer to contact the shipping company to send the package to the customer's designated address.


4. We will provide installation instructions and shop drawings: Show location and extent of operable partitions. Include plans, elevations, sections, details, attachments to other construction, and accessories. Indicate dimensions, weights,conditions at openings, and at storage areas, and required installation, storage, and operating clearances. Indicate location and installation requirements for hardware and track, including floor tolerances required and direction of travel. Indicate blocking to be provided by others.

5. Upon request at least two experienced installers can be sent to direct the installation, commission and operation. Related visa application, round-trip transportation expenses, accommodation and food during installation and labor cost for our installation specialists will be extra calculated. A construction team of 3-5 people and related scaffolding, cranes, elevator, and other needed tools for site installation should be provided.

6. Adjust operable partitions to operate smoothly, easily, and quietly, free from binding, warp, excessive deflection, distortion, nonalignment, misplacement, disruption, or malfunction, throughout entire operational range. Lubricate hardware and other moving parts.
 

7. Delivered to the clients after confirmed all smooth operation, project  perfect end.



Company Introduction

As manufacturing factory headquartered in guangzhou, an important port city of China's foreign trade, Guangzhou CN Electrical Equipment Co., Ltd. is a high-tech enterprise which integrating R&D, Manufacturing and Trading, one of the leading and exclusive manufacturer of Automatic Partitions and Automatic Doors and  the only company in China which has a dedicated manufacturing plant of electrically operated vertical lift folding partition Walls in China.  

Our factory covers an area of more than 12,000 square meters. We have our products installations throughout china and abroad. The annual manufacturing capacity to 500 sets of various automatic revolving doors and 10,000 square meters of motorized partition walls, we have produced and installed Automatic Doors and Electrical Movable Walls for all types of establishments like high end residences / conference room / banquet halls in hotels / auditorium / convention centre / meeting rooms / board rooms / training rooms etc. 

All the materials used are in compliance to international standards such as ISO 9001, CE, IEC etc. With the strictly control for designed, production, inspection and services by our advanced quality management system, enable the products of Guangzhou CN Electrical Device Co., Ltd selling well in the domestic market, and keep rapid growth in the European, American, Asia and Middle East market. Successfully established strategic cooperative partnership with famous domestic and foreign enterprises like Siemens, Phillips, and BEA etc. 


Factory Details

Our factory is equipped with state of the art hydraulic press brake bending machines, automatic cutting machines for cutting aluminium and MDF boards and complete equipment like drilling, milling, bearing and lamination press machines, processing and manufacturing any type of doors and movable walls as per customer choice.



FAQs

1.Q: Are you a manufacturer or trading company?

A: We are a manufacturer, our factory covers an area of about 12,000 square meters and the building area is more than 9,600 square meters.


2. Q: What is the price of the movable wall?

A: Our mobile wall system is customized, the cost is calculated by square meters, prices vary widely according to thickness of walls and surface finish requirements. Therefore, for acurate quotation we need detailed dimensions such as height, width and finish requirements. If possible, we also need your layout drawings.


3. Q: Is the movable partition acoustic (soundproof)?

A: Yes, our movable wall system is soundproof. We have different acoustic material fillings and various sound absorbing panels to achieve different acoustic ratings. 
The partition panels comes in different thickness, and different acoustic rating from 36db to 50 db depending upon the project requirement. We can provide panels with raw MDF or any type of finish such as laminate, veneers, white boards, fabric, pin-boards, painted surfaces etc to compliment your bilding environment and decor.

4.Q: How to install mobile partitions? 

A: We provide installation guide services or send technicians as required.  We have very detailed drawings and videos showing how to install, so your employees just need to follow them step by step.


5.Q: What is your payment terms?

A : 30% - 50% of total amount by T/T as deposit when confirmed the order and balance paid by T/T before loading container, or irrevocable L/C at sight.

6. Q : What is your warranty ? What do we do in case of problems?

A : 3 years quality warranty is provided, including frame unfading nor peel-off, hardware and accessories working properly under correct operation. In case of our quality problem, we will provide replacement by international courier. Immediate delivery of replacement parts with available in stock, and if not stocking, the time should be depending on material ordering time which is normally 10-15 days.

Product Tag:
Related categories:
Scroll to Top