China Conveyor Idler Frame

Min.Order: 100
Product origin: Hengshui, Hebei, China
Infringement complaint: complaintComplaint
US$ 5 ~ 15

Description
 
DescriptionCEMA,  DIN, JIS, AS, SABS, ISO Standard Design & JUXIN ODM
Pipe 1)  Material : Q235 carbon steel equal to DIN S235JR
2)  Roller Diameter : φ63.5mm ~ φ219mm / 2 1/2 inch ~ 8 5/8 inch
3)  Roller Length:  150mm ~ 3000 mm
4)  Thickness : 3.0 ~6.0 mm
Shaft 1)  Material : 45# steel equal to DIN C45
2)  Cold-drawn bright round steel
3)  Shaft Diameter:  20mm,  25mm,  30mm, 40mm, 45mm, 50mm
Bearing1)  Single Row Deep Groove Ball Bearing 2RS&ZZ with C3 clearance
2)  Brand: SKF,FAG,NSK,HRB, LYC, ZWZ or according to your requirement
Bearing Housing1)  Material : Q235 carbon steel equal to DIN S235JR
2)  Cold press working fit ISO M7 accuracy
3)  Material thickness: 2.5mm ~ 5.0mm
Seals1)  Labyrinth seal, nylon 6 material
2)  JUXIN's patented product
Grease2# Lithium grease lubricant
Painting1)  Ordinary painting, hot galvanized painting, Powder painting
2)  Color: Black, red, yellow, blue or according to your requirement
Unit:mm
Belt WidthRollerMain Dimensions
DLDrawing No.BearingAECHH1H2PQd
50063.5200G1026203/C4740800570200119272170130M12
76G2026204/C4567210122281
89G3026204/C4559220135.5300
65076250G2036204/C4890950698225122310170130M12
89G3036204/C4691235135.5329
108G4036205/C4684265146346
80089315G3046204/C410901150862245135.5366170130M12
108G4046205/C4855270146385
133G5046305/C4841305159.5408
1000108380G4056205/C4129013501038300159437220170M16
133G5056305/C41023325173.5461
159G6056306/C41020370190.5491
1200108465G4066205/C4154016001262335176502260200M16
133G5066305/C41248360190.5527
159G6066306/C41244390207.5556
1400108530G4086205/C4174018101433350184548280220M16
133G5086305/C41419380198.5573
159G6086306/C41415410215.5602









QustionsAnswer
Plant Size65,000 Square Meters
Sample Policysample is available for free.But we don't bear the Express cost.
MOQ10 sets for idlers;1 pcs for pulley
Customization Accept Customization 
Delivery Time15-20days after receiving the deposit
Payment Term30% T/T in advance, then 70%T/T before shipment.














 
Scroll to Top