MP3/FM/SD/Bluetoothower Amplifier Tabletop CD Player

Min.Order: 20
Product origin: Guangzhou, Guangdong, China
Infringement complaint: complaintComplaint
US$ 148

Description
CD player with MP3 and FM & Bluetooth and RS-232                                                            
FTD-25CD


A pair of rack ears are included that allow the user to mount the player in a standard 19"
audio/electronics rack. To install the rack ears, refer to the diagram and follow these steps:

1. Remove three screws from the side panel of the player toward the front.
2. Place one rack ear in proper position,
paying attention to correct alignment.
3. Reattach the three screws.
4. Repeat procedure for second rack ear,
located on the other side of the unit.

Specifications:
 
ModelFTD-25CD
DescriptionCD/Mp3 Player with Tuner
Compatible mediaChannel A: CD,USB,Bluetooth
Channel B: USB,Bluetooth,FM(RDS) ,AM
InputCD slot in & USB& BT
Frequency Response20Hz-20KHz
S/N Ratio60dB
Pitch Adjustment±24%
Radio FrequencyFM: 87-108MHz
AM: 522-1620KHz
Power consumption30W (0.5W standby)
Dimension330(W)×267(D)×49(H)mm
Weight4.1kgs


Company Introduction

Guangzhou FTD Audio Limited is a leading manufacturer of Public Address System and Conference System in China, We are focus on R&D and our Professional R&D team already 15 years' experience on Audio field. FTD audio will offer the professional products and service to each of partner and do a win win business with our partners! 


FAQ:
1. Are you manufacturer?
Yes, we are public address system manufacturer located in Guangzhou, China.
Welcome to visit our factory.

2. Is sample order available? Is free sample available?
Firstly, sample order is available. Secondly, for new clients, we will return the sample fee after big order placed.
 
3. What's your warranty period?
Our warranty period is 12 months for speaker. 
 
4. What's your payment terms?
We accept Western Union and TT. 30% deposit in advance, balance 70% before shipment.
 
5. Where is your main market?
Customers are mainly from Europe, Middle East  and South Asia.

6. How many days do you need to prepare for  the goods?
It takes 30 working days for large order. 
Scroll to Top