DIN Rail 3 Phase Smart Digital Energy Kwh Monitor Meter

Min.Order: 1
Product origin: Shanghai, China
Infringement complaint: complaintComplaint
US$ 67.5

Description
Product Description

ADL400 din rail 3 phase energy power meter with CE approval

ACREL ADL400 3 phase din rail energy metering product with LCD is CE and IEC approval, suitable for 110V, 120V, 220V, 230V,

240V AC low voltage system.ACREL ADL400 could be equivalent to Pilot PMAC903 , CET PMC-340 or Eastron SDM630MT 

It is with 0.5 accuracy,easy to install and perfectly match with your billing system.

It is widely used in kinds of control system, SCADA system and power management system.


Functions and parameters

Main functions of 3 phase energy meter ADL400
 
6+2 digits LCD display,backlight (999999.99kwh)
Accuracy:0.2(voltage,current and frequency),0.5(active power,reactive power and power factor)
Input voltage:AC 3x220/380V, AC 380V,AC 3x57.7/100V or 3x100VInput current:10(80)A or 5A by CTs
Frequency: 50hz or 60hz
Standard communication:RS485 modbus-RTU (C)
Pulse output
Optional functions:

*Multi-tariff energy(F) Max demand kWh and time happened
*2~31st Voltage and current harmonic(H) 

Data sheet
 
Voltage
Reference voltage
3×100V, 3×380V,3×57.7/100V, 3×220/380V
Consumption
<10VA
Impedance
>2MΩ
Accuracy
±0.2%
Current
Reference current
3×10(80)A or 3×1(6)A by current transformers
Accuracy class
Error±0.2%
Consumption
<1VA
Power
Active, reactive, apparent power,  class ±0.5℅
Display
LCD
Frequency
45~65Hz, class ±0.2%
 
Communication
RS485, Modbus-RTU protocol
Option Function
 
Multi tariff energy: Adapt 4 time zones, 2 time interval lists, 14 time interval by day and 4 tariff rates;Max demanded kWh and time happened;Frozen data on last 48 month,last 90 days;
     Harmonics:2~31ST Voltage andcurrent harmonic
Operation Temperature
-10 ºC~+55 ºC
Storage Temperature
-40 ºC ~+70 ºC
Altitude
≤ 2000m
Relative humidity
≤95%RH, no condensation, without corrosive gas

Dimensions and Wirings




Certifications
CE

About ACREL


ACREL is a professional manufacturer with over 18 years experience in energy meters

FAQ


Q:Where is your company located?
 
A:Our headquarter is in Shanghai, our factory locates in Jiangyin,Jiangsu Province,China.It takes about 1 hour by car from Shanghai Hongqiao International Airport to our factory. As it is low labor cost here in Jiangsu,we can offer a better price with high quality.

 
A:Our headquarter is in Shanghai, our factory locates in Jiangyin,Jiangsu Province,China.It takes about 1 hour by car from Shanghai Hongqiao International Airport to our factory. As it is low labor cost here in Jiangsu,we can offer a better price with high quality.
 
Q:What's your lead time?
 
A:Sample time 1-3days,mass production 10~20days for order more than 500pcs
 
Q:Payment terms?
 
A:Usually,TT,credit card,western union,in cash and so on.You can also choose to pay 30% as deposit and the balance before shipment or against copy of B/L if the order is large.
 
Q:Can other logo be put on your products(ODM)?

A:Yes,but MOQ for ODEM will be at least 100pcs.We also need you provide logo Ai Format or EPS.

Product Tag:
Related categories:
Scroll to Top