From the review of drawings to production evaluation, to product production and quality inspection, our professional engineers are responsible for each link.
Specifications description
Machining process | Die casting, CNC machining |
Optional material | aluminum alloy, zinc alloy, copper alloy, tin-lead alloy, magnesium alloy, etc. Aluminium alloy: A356, A380, A383, A413, ADC12, LM2, LM25, ZL101, etc. Zinc alloy: ZAMK3, ZCDC1, Z33520, etc. Copper alloy: C83800, C84500, C83600, H59, H62, H63, T1, T2, T3, TU0, TU1, C54400, C51900, C52100, etc. Magnesium alloy:ZM1, ZM2, ZM3, ZM4, ZM5, ZM10, YM5, etc. All materials are with material certificates, in compliance with international material specifications and material substitution levels. |
Optional surface treatment | Zinc plating, Chrome plating, Nickel plating, phosphating, blacking, painting, hand dull polishing, mirror polishing, elctro polishing, passivation treatment, etc. |
Size | According to customers' drawings or samples |
File Formats | Solid Works,Pro/Engineer, AutoCAD(DXF,DWG), PDF,TIF etc. |
Application | Mechanical parts, telecom communication equipment, Auto & Motorcycle & Bicycle parts, Led light housing & Led Heatsink, Pump housing, Furniture accessories, new energy equipment, etc. |
die casting production line, investment casting production line, Milling, & Drilling Machines, Grinding Machines, NC Lathe Machines, CNC Turning Centers, etc.
Spectroscope testing, CMM testing, optical Projector testing, Rockwell hardness testing, salt spray testing, X ray, etc.
Quality control
Packaging
1. How can I get the quotation?
You can send us a mail or contact us by whatsapp, wechat, etc. And send us your detailed requirements(drawings, materials, quantity, tolerance, surface treatment, etc.), and we will calculate detailed cost for you.
2. If we don't have detailed drawing, can you make drawing for us?
Yes, we have professional engineer team can assist you to make drawings.
3. When can I get the sample?
The production time of molds needs to be determined according to your products. Usually, the processing of molds and the production of samples can be completed in about 20 days.
4. How long is the production time?
14 to 30 working days based on the order quantity.
5. What is the payment method.
Molding and tooling: 100% TT advanced.
Parts product order: To be confirmed according to the actual order situation.
6. What kind of drawing format is workable for you?
PDF, STP, STEP, LGS, ISGS, OBJ, STL, GLB, DWG, etc.
7. How do I know the production? and shipping process?
We will double confirm your requirements and send you the sample before the mass production . During the mass production, we will regularly report to you the production progress.
8. How do I know the shipping process?
Before shipment we will confirm with you about all the details including CI and other attention issues. After ship out, we will inform you of the tracking number and keep updating the latest shipping information for you.
We do hope to establish long-term cooperation with you. Should you have interest or any question, please contact us with no hesitate as below: