New design use cold water to spray and cool down bottle cooling tunnel
Tunnel spraying cooler adopts recycling warm water to perform pre-cooling and use spraying cold water to cool down, which takes 3 procedures; the temperature and holding time can be regulated and auto controlled; This type cooler is widely used to cool the bottle, can packed type acidic milk, juice, beverage, beer, and flavor etc.
Technical |
Model | PLL-6000 | PLL-10000 | PLL-12000 | PLL-15000 | PLL-18000 | |
Line speed of the conveyer | 110-553mm/min | |||||
Cold water consumption (m3) | 21 | 40 | 55 | 80 | 120 | |
Total power (kw) | 9.6 | 10.6 | 13.6 | 16.5 | 25 | |
External dimension(mm) | Length | 6500 | 12000 | 14500 | 16880 | 19880 |
Width | 2250 | |||||
Height | 1735 | |||||
Weight(kg) | 3000 | 5000 | 6500 | 8500 | 12000 | |
Tunnel area(m2) | 13.5 | 22 | 26 | 32 | 38.5 |
1 ) Q: How can we visit your factory?
A: If you come from abroad, air to shanghai airport, then we can pick you up at airport.
2) Q: How do you ensure the quality of your products?
A: Our Company is a state owned enterprise with more than 16 years experience , strict operation policy is performed, advanced processing machines guarangtee the precision of all components, workers with operation license, parts get multiprocessing, transmission& electrical parts are of international famous brand. Series of test and inspection are done in the whole producing state.
3) Q: What payment methods your company accept?
A: We accept most of the payment methods , but mainly accept T/T, L/C at sight .
4) Q: How long is the warranty time for your products?
A: Our officially promised warranty time is 12 months after commissioning .
5) Q: I am new in this field,can you supply us turnkey services?
A: YES.We can supply all the system including Market Analysis/Product Analysis/Location Choice/Processing Flow Design/Equipment Layout Design/Building Design direction/Equipment mode selection/Equipment Manufacturing/Equipment Mounting/Equipment Debugging/Worker Training.
6) Q: What ' s the shipment terms and delivery time of your company?
A: Well, the delivery time depend on the quantity of your order. Usually is 20 days . For some customized machine 30 days is necessary.
7) Q: Can you supply OEM services?
A: Yes,we have our R&D team,and we have more than 400 workers with workshop area 75000 square meters.
8) Q: Do you give any Discount?
A: I will surely try my best to help you get those by the best price and good service at the same time.