High Speed Protective Garments Fabric Non Woven Paper/PE/BOPP Breathable Film Compound Laminating and Coating Machine

Min.Order: 1
Product origin: Ningde, Fujian, China
Infringement complaint: complaintComplaint
US$ 70000 ~ 150000

Description
Laminating Machine
Main Features

1.This Non woven fabric laminating machinemaking use of the good adhesive property of polypropylene & polyethylene at melting status machine adheres and aminates Non woven\Paper\BOPP\PE\Aluminum foil to Nonwoven fabric,the extruder with helical gear reducer steel adopts automatic temperature-control system to adjust melting temperature, the screw and cylinder are made of alloy steel and done treatment of nitrogenation.

2.The double-die can do single or double-face coating, width of coating & laminating can be regulated, and control coating thickness,laminating speed, automatic edge cutting, edge-blowing, cutting-off and winding devices are applied.

3.This machine has the functions of fully automatic material receiving and refuelling,PLC control system,fully automatic weight control system,man-machine operation interface, and it is a high-quality supply in the same industry.


 Technical Parameters
ModelJXL-M1000JXL-M1200JXL-M1600JXL-M1800JXL-M2400
Extrusion die width1200mm1400mm1800mm2000mm2600mm
Coating width500-1000mm600-1200mm800-1600mm900-1800mm2000-2400mm
Max.Coating speed10-150m/min10-150m/min10-150m/min10-150m/min10-150m/min
Coating thickness0.01-0.1mm0.01-0.1mm0.01-0.1mm0.01-0.1mm0.01-0.1mm
L/d ratio for screw32:132:132:132:132:1
Rewinding roll diameter1200mm1200mm1200mm1200mm1200mm
Overall size12500*7000*5000mm13000*8000*5000mm13000*9000*5000mm13000*11000*5000mm15000*12000*6000mm
Total power70kw80kw100kw130kw150kw
Mirror cool roll diameter510mm510mm510mm510mm510mm
Adopt materialNon woven\Paper\BOPP\PE\Aluminum foil

 

FAQ
1. Q:How long will your engineer reach our factory?
A:Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor etc.All is prepared)

2. Q:How many days will you finish installing?
A:We will finish installation and training within 15 days.

3. Q:What should we charge for your engineer?
A:You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 100USD one day per person.

4. Q:How long is your machine's warranty period?
A: All our machine have one year guarantee, starting from finished installation.

5. Q:How could you do if the parts broken within warranty?
A: We would express the free replacement parts during the warranty date.

6. Q:Does your engineer understand English?
A:Our engineers understand a little English. All our engineers have more than five years machine installation experience.

7. Q:How do we solve the machine problem after your engineer leaving?
A:Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.
Product Tag:
Related categories:
Scroll to Top