DIN Rail Digital Energy Meter Kwh Voltage Current Power Consumption Meter

Min.Order: 1
Product origin: Wuxi, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 22 ~ 32

Description

Din Rail Digital Energy Meter kWh Voltage Current Power Consumption Meter

Product Description

Elecnova din rail mounted energy meter DDS1946-2M single phase meter is a digital energy meter complies with the MID certification Class B (2014/32/EU). With the 32mm width (2DIN module) compact design, it's right perfect for the fiscal metering for the home use wall mounted EV charger. The DDS1946-2M is equipped with a LCD display for parameter checking, the DDS1946-2M also has the standard Modbus-RTU communication protocol, the measuring data could be integrated with the display of the EV charger by RS485 interface.

 

Technical Specifications

 

 
DDS1946-1P
DDSF1946-1P
DDS1946-2P
DDSF1946-2P
DDS1946
DDSF1946
DSS1946
DSSF1946
DTS1946
DTSF1946
Normal Voltage
230V
230V
230V
3*400V
3*230/400V


Current
Direct input
5(40)A
5(100)A
5(100)A
5(100)A
5(100)A
Via CT input
-
-
1.5(6)A
1.5(6)A
1.5(6)A
Accuracy
 
Class 1(Optional:Class 0.5S)
Frequency
 
45Hz~65Hz
Voltage Range
 
0.8Un~1.2Un


Start Current
Direct input
0.004Ib
Via CT input
0.002In
Consumption
<2VA
Energy Pulse
1 output, pulse width (80±20%) ms
RTC Error
≤0.5s/day
Communication
RS485, Modbus-RTU, 2-wire, up to 9600bps
IP Degree
Front: IP51
Operating Temperature
-10ºC ~ 55ºC
Storage Temperature
-25ºC ~ 70ºC
Relative Humidity
≤93%
Certificate
CE ISO9001,MID
 

Feature

 

Typical Wiring

 

Application

Company Profile

 

FAQ

Q: Are you trading company or manufacturer ?
A: We are factory located in Jiangyin Jiangsu Province.




Q: Does your company provide customized manufacturing?
A: We provide OEM/ODM service to our customers. Our experienced R&D team will give our customer solution in a high efficiency way.




Q: How long is your delivery time?
A: 3-5 working days for the items were in stock, 15-21days for the items out of stock.




Q: Do you provide samples? Is it free or extra ?
A: You need to pay for the sample and cover the freight as well.




Q: What is your terms of payment ?
A: Order amount less than $3000, 100% paid before shipment, order amount more than $3000,30% as deposit, 70% before shipment, or by negotiated for the both parties.

Product Tag:
Related categories:
Scroll to Top