Automatic Coated Production Line Laminating Machine Jumbo Roll Slitter Rewinder Lamination Machine for Flexible Package Plastic Film, Laminating Film, BOPP Film

Min.Order: 1
Product origin: Ningde, Fujian, China
Infringement complaint: complaintComplaint
US$ 120000

Description
Laminating Machine
Main Features

1.This Non woven fabric laminating machinemaking use of the good adhesive property of polypropylene & polyethylene at melting status machine adheres and aminates Non woven\Paper\BOPP\PE\Aluminum foil to Nonwoven fabric,the extruder with helical gear reducer steel adopts automatic temperature-control system to adjust melting temperature, the screw and cylinder are made of alloy steel and done treatment of nitrogenation.

2.The double-die can do single or double-face coating, width of coating & laminating can be regulated, and control coating thickness,laminating speed, automatic edge cutting, edge-blowing, cutting-off and winding devices are applied.

3.This machine has the functions of fully automatic material receiving and refuelling,PLC control system,fully automatic weight control system,man-machine operation interface, and it is a high-quality supply in the same industry.


 Technical Parameters
ModelJXL-M2400
Extrusion die width2600mm
Coating width2000-2400mm
Max.Coating speed10-150m/min
Coating thickness0.01-0.1mm
L/d ratio for screw32:1
Rewinding roll diameter1200mm
Overall size15000*12000*6000mm
Total power150kw
Mirror cool roll diameter510mm
Adopt materialNon woven\Paper\BOPP\PE\Aluminum foil

 

FAQ
1. Q:How long will your engineer reach our factory?
A:Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor etc.All is prepared)

2. Q:How many days will you finish installing?
A:We will finish installation and training within 15 days.

3. Q:What should we charge for your engineer?
A:You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 100USD one day per person.

4. Q:How long is your machine's warranty period?
A: All our machine have one year guarantee, starting from finished installation.

5. Q:How could you do if the parts broken within warranty?
A: We would express the free replacement parts during the warranty date.

6. Q:Does your engineer understand English?
A:Our engineers understand a little English. All our engineers have more than five years machine installation experience.

7. Q:How do we solve the machine problem after your engineer leaving?
A:Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.
Product Tag:
Related categories:
Scroll to Top