Description
Product Name | Injection Plastic Motorcycle Flip up Helmet Mould |
Product material | ABS |
Core& Cavity Steel | 718 |
Steel hardness: | HRC34-38 |
Mould Standard | DME |
Cavity Number | 1*1 |
Injection System | DIRECT GATE |
Ejector System | ejector BLOCK |
Cycle Time | 40s |
Tooling lead time | 60 days |
Mould life | 500, 000shots |
Quality assurance | ISO9001 |
|
Our Advantage | 1. High quality |
2. Reasonable price |
3. On time delivery |
4. Good After-sale service |
5. Strict quality control |
6. All the mould are automotic. |
|
Offer you | In-time response on letters, telephone calls or fax |
In-time supply the quotation and mould designs |
In-time communication on the technical points |
In-time sending pictures for the mould machining progress and mould finishing schedule |
In-time mould test and sample delivery |
In-time mould delivery. |
For more information please contact us. |
Processing | Time |
Prepare Steel | 5 days |
CNC Machining | 10 days |
Drill | 8 days |
Heat treatment | 6 days |
High speed CNC Machining | 7 days |
Assembling and Fitting | 6 days |
Polishing | 6 days |
T1 mould test | 2 days |
JSL Mould Quality Control
For the Q/C of mould, there are 3 steps:
1. Mould Material Q/C
- Mould Steel Checking(Hardness, flaw detection)
- Mould Standard Spare Parts Checking(hardness, size, flaw checking)
2. Mould Making Process Q/C
- design checking (part design, mould design, mould engineering drawing)
- checking each part of mould's size after machining, according to 2D drawing
- mould testing(check mould running condition)
3. Check with customer's requirement again before mould shipping.