200L Stainless Steel Beer Brewery Brewing Equipment Bright Vessel Fermenter Machine Making Beer

Min.Order: 1
Product origin: Jinan, Shandong, China
Infringement complaint: complaintComplaint
US$ 50000 ~ 90000

Description

 

Product Description

 

200L SUS304  Beer Brewing Equipment For Sale




UNitComponentsCapacity Specification 
Milling Miller 100KG/HDouble Roller,Noise<60db
Brewhouse Mash/Lauter tun200LMashing Process:Decoction.Infusion.Multi-step infusion 
  Brew Kettle/Whirlpool Tank 200L
Heating source:Steam,Electric,direct fire
SUS304/Red copper
  Hot Water Tank  300L Heating source:Steam,Electric,Gas
  Heat exchanger2 SQM Stainless steel plate
 Fermentation tank  Fermentation Tank 
(The number according to customer requirements)
200L or 300L Top manway/Side manway
Drying hop port to brew IPA
Dimple Plate Cooling jacket
Carbonation port to fill CO2
 Yeast Adding Tank 3L SUS304 Stainless Steel
 Cooling System   Glycol Water tank 600L Equiped with PU level indicator
 Chiller 2Hp UL/CE certified electric elements,Copeland compressor
Pump3T/H 
Cleaning SystemDisinfection Tank50LSUS304 full welded
Alkali Tank50L
Pump3T/H
Control System Control Cabinet PID or PLC 
Optional

Auger System

Grain Case
Grist Hydrator 
Piping flow panel for Brewhouse
Brewhouse Separate PLC Controller
Steam Boiler Customized 
......

 

 
Hot Products
Company Profile

Our Advantages

Packaging & Shipping


Packaging Details

1.LCL/FCL(20GP/40GP/40HQ).
2.Packed with plastic film in fumigation free wooden case or fixed with iron frame.
3.Up to export standard, suitable for delivery.
4.Customer's requirements available.

 
FAQ

Our service for you:

1. Free consultation service before, during, and after sales Layout plan in 3D or CAD drawings of
your brewery;


2. Professional engineers going abroad for the installation ,debugging, and training, all the
travelling cost and locate food, and hotel shall be afforded by the buyer


3. The installation period is about 15 days including assembling brewing tanks and training the
operator. It is free of charge within 15 days. The buyer will be charged USD 50 per day for each engineer
for the extended installation.


4. Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication
method available to the customer.


5. Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment,etc. should
be installed separately. If needed, cost calculate additionally. 


6. Brewing technology, brewing formula, can be offered available

7. More spare parts are available to offered freely.
Product Tag:
Related categories:
Scroll to Top