Model NO. | WLX-4 |
Application Area | Food |
Machine size | 5500*560*1000mm |
Transmission mode | Variable frequency speed regulation/PLC control |
Configuration meatball machine | 2tower |
Capacity | 2-4T/batch |
Power | 1.65kw |
Power supply | 380V/50hz |
Material | Stainless steel |
Origin | China |
Meatball forming steaming line is composed of three parts: forming and cooking part, cooling part, transmission system part.
The whole machine is made of stainless steel, which really realizes the automation of making meatballs, reduces the labor intensity, increases the production of meatballs, and improves the production efficiency.
Meatball processing
Meatball forming steaming line is composed of three parts: forming and cooking part, cooling part, transmission system part.Working principle 1. Meatball forming tank body with hot water circulation pump as the power of meatball forward movement, there are two reducer at the end of the tank respectively drag the scraper and the conveyor chain plate, so that the formed meatball smoothly and neatly transported to the cooking tank. 2. The power used for the forward movement of the shaped meatball in the cooking tank is: A plurality of groups of scraper and the conveyor chain plate at the end of the groove, through the frequency converter adjustment to achieve the scraper. The motion speed of the chain plate is suitable for the process requirements. 3. The cooling tank is equipped with a water inlet and a filter outlet. The mature meatballs are cooled quickly in the cooling tank, which is conducive to refrigerating under the plate and the lower part. 4. The steam pipeline and water circulation system make the water temperature in the tank maintain in the set temperature, the water circulation system is located in the forming tank, the flow is adjustable, the flow can be adjusted according to the output size, to achieve a reasonable speed of meatball movement.
Henan Zhongzhenxing Trade Co., offers a complete turnkey solution for all customers, including pre-sales consulting, project design,equipment manufacturing, global installation, spare parts supply, and excellent after-sales service.
Pre sale Service:
1. service consultation in 365 days a year.