Insulated boots and gloves are the necessary safety equipment for power system operation and maintenance DL / T1476 Regulations for preventive test of electrical appliances for safety of electric industry the test method and cycle of common safety equipment such as insulating boots and gloves are stipulated.Insulated boots and gloves voltage test, the cycle is half a year, the test process is not allowed to break down, Simultaneously insulated boots leakage current is less than the limit value. The instrument adopts multi-channel high voltage leakage current measurement patent technology and infrared data communication technology to achieve the safe measurement of high voltage leakage current purposes.Through the application of this technology, the tester is completely isolated from the high-voltage system, which can not only accurately measure the multi-channel high-voltage leakage current, but also ensure the personal safety of tester. In order to improve work efficiency, 8 samples can be tested at the same time. In order to avoid repeated testing , the high voltage breaking patent technology is adopted. During the process of testing, the breakdown samples can be separated from the High Voltage test system. No breakdown of the test continued until the test is completed.
2. Main functions 2.1 Simultaneous testing of 8 insulating boots or gloves to measure leakage current separately. 2.2 Large screen LCD display with a large amount of information, only one screen simultaneously can display 8 high-voltage leakage current, test voltage, current, timing time and other parameters. 2.3 Parameters such as test voltage and primary current of test transformer can be measured. 2.4 The use of proprietary infrared communication technology ,in order to completely isolate the operating table from the high-voltage system ensure the safety of the tester. 2.5 Fully automatic pressure test.After the start of the test, the instrument automatically shuts down automatically to the national standard to request the booster speed to raise the voltage automatically,and rises to the predetermined voltage to start the time and maintains the test voltage, the time automatically drops the voltage to zero and the power is cut off. Simultaneously, the leakage current of each sample is displayed and the test results are automatically saved. 2.6Has a special earthing container for easy operation. 2.7 Each sample is equipped with a high-voltage break mechanism, when any one way of breakdown, the road test will be automatically removed from the high pressure, and do will not affect the test. 2.8 Has the function of overvoltage and overcurrent protection. 2.9 High pressure hazard warning lamp display. 2.10 The instrument can save 60 groups of test data and results, which always can be consulted at any time. 2.11 Real-time calendar clock functionality. 3. Main technical parametersRated output voltage:50kV (Insulation boots and gloves test) Rated capacity:5kVA Output voltage range:50.0 kV(250V) Voltage measurement error:<±(1.0 %U+0.1%Umax), Where U is the indication value and Umax is the upper limit value of the range. Input current process:25.0A Current measurement error:<±(0.5%I+0.05%Imax), Where I is the indication value and Imax is the upper limit value of the range Test position: 8 Leakage current path:25.0mA Leakage current measurement error:±(0.5%I+2 words) Leakage current resolution:0.01 mA