China New Tder Nude LPG Gasoline Gas Propane Forklift with Good Price

Min.Order: 1
Product origin: Xiamen, Fujian, China
Infringement complaint: complaintComplaint
US$ 7894 ~ 13758

Description
TDER warehouse and construction using lpg gasoline forklift with EPA engine 
General1Model FG20FG25
2Power Type LPG & GasolineLPG & Gasoline
3Rated Capacitykg20002500
4Load Centremm500500
Characteristic&Dimension5Lift Heightmm45004500
6Fork SizeL×W×T   mm1070×120×401070×120×40
7Mast Tilt AngleF/RDeg6°/12°6°/12°
8Front Overhang (Wheel center to fork face)mm465465
9Ground Clearance(Bottom of mast)mm110110
10Overall DimensionLength to face of fork(Without fork)mm25952595
11Overall Widthmm11501150
12Mast Lowered Heightmm20702070
13Mast Extended Height(With backrest)mm40704070
14Overhead Guard Heightmm20702070
15Turning Radius (outside)mm23102310
Performance16SpeedTravel (Full load)km/h1919
17Lifting (Full load)mm/s530530
18Max.Gradeability (No load/Full load)%2020
Chassis19TireFrontmm7.00-12-12PR7.00-12-12PR
20Rearmm6.00-9-10PR6.00-9-10PR
21Wheelbasemm16001600
22Service weightkg35903790
 32TransmissionType Hydraulic
33StageFWD/RVS 1/1
FAQ

1. Why choose us?
As a manufacturer, Tider industrial is committed to offer not only products with high quality and performance and competitive price, but also in-time delivery and comprehensive 7/24 after-sale services.

2. What is the product range of our factory ?
Tider industrial is a large-scale machinery manufacturing enterprise primarily specializes in supplying wheel loaders, forklift trucks and related attachments. We can also customize non-standard products according to customer's requirements.

3. What payment terms can we accept?
Normally 30% deposit is required in advance, 70% balance shall be settled before shipment. And 100% irrevocable L/C at sight with the terms we agreed can also be accepted.

4. What Certificates do we have?
All products meet with the ISO9001 Quality System and have acquired CE certificate. EPA approval will be available if needed.

5. How about our delivery time?
Usually it will take 15 to 30 days after receiving your deposit. About standard products, we always have in stock and can deliver immediately. But customized products will take more time, depending on the requirements of your order.

6. Can we provide OEM service?
Tider industrial can provide customized products according to customers' requirements, both OEM and ODM are acceptable.
Product Tag:
Related categories:
Scroll to Top