Description
Product Description
Wine Gin Whiskey Storage Tank Fermentor 500L 1000L 2000L Beer Brewery Tank
Beer Fermenter |
Material: | SUS 304, SUS 316 |
Thickness of material | Interior Shell: 3mm/4mm, can be customized Exterior Shell: 2mm/3mm, can be customized |
Insulation | Polyurethane-thickness: 80mm |
Cooling jacket | Dimpled plate on cone and side |
Cooling media | Alcohol water. |
Spare Parts | Full sanitary sample valve; Equip with Electromagnetic valve; Shockproof pressure gauge on CIP arm; Safety valve on fermenter top; Tri-clamp discharge arm with butterfly valve; Dry hopping port with hops adding device; CIP arm with 360°coverage CIP spraying ball; Thermowell with high accuracy temperature sensor: PT100 Ice water pipe: PPR; Ice water pipe insulation: Rock-Wool; Carbonation device for CO2 is option; |
Manufacture Arts | 100% TIG welding with pure argon gas shield; Interior Finish: Overall polishing to 0.4~0.6μm without dead corner Inner tank inside surface fully acid washed and passivated after polishing. Form protective film, easy to clean, no sanitary dead angle. |
Hot Products
Company Profile
Our Advantages
Packaging & Shipping
Packaging Details1.LCL/FCL(20GP/40GP/40HQ).
2.Packed with plastic film in fumigation free wooden case or fixed with iron frame.
3.Up to export standard, suitable for delivery.
4.Customer's requirements available. FAQ
Our service for you:
1. Free consultation service before, during, and after sales Layout plan in 3D or CAD drawings of
your brewery;
2. Professional engineers going abroad for the installation ,debugging, and training, all the
travelling cost and locate food, and hotel shall be afforded by the buyer
3. The installation period is about 15 days including assembling brewing tanks and training the
operator. It is free of charge within 15 days. The buyer will be charged USD 50 per day for each engineer
for the extended installation.
4. Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication
method available to the customer.
5. Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment,etc. should
be installed separately. If needed, cost calculate additionally.
6. Brewing technology, brewing formula, can be offered available
7. More spare parts are available to offered freely.