Plastic Bottle Cap Holder Moulding and Hot Runner Steel 4-24 Cavity Handle Mould

Min.Order: 1
Product origin: Taizhou, Zhejiang, China
Infringement complaint: complaintComplaint
US$ 3000

Description
Plastic Bottle Cap Holder Moulding and Hot Runner Steel 4-24 cavity Handle Mould

MOULD DESCRIPTION
Mould nameHandle mould
Mould cavity4-24 cavity
Mould steelP20, H13, 2738, 718H.
Core&Cavity materialS136
Mould baseLocal, LKM, PME.
RunnerCold runner, hot runner.
Hot runner brandDomestic, Yudo, Hasco.
Design softwareAutoCAD, stp, vt, UG.
Mould life2M shots.
Delivery time35-45 days

Features

Handle Mould
The handle has a side handle and a lifting handle on the neck of the bottle mouth, both to facilitate lifting the bottle. They are of various shapes and widely used, including those for mineral water, edible oil bottles, soy sauce and vinegar bottles, and paint barrels. Most of the handle molds need to be processed by wire cutting and fine carving. The mold is easy to form with good exhaust, and can provide customers with molds with high use value.

MOULD MANUFACTURE  PROCESS
Grinding→ Fly-cutter → CNC Milling→ Drilling→ Lathe→ Boring lathe→ Electric pulse → Fine fly-cutter→ Polish→ Electroplate→ Assemble


Business Procedure
1.Quoting Price based on customer's request.
2.Signing the sales contract/ Stamping Proforma Invoice.
3.Starting the 2D/3D drawing of the mould. 
4.Sending customer mold 3D/2D design drawing for confirmation.
5.Starting Manufacturing after design approved by customer.
6.Testing mold with noticing customer.
7.Delivering the samples for customer's approval.
8.Doing final polish or treatment for the mold after samples approved.
9.Shipment.

AFTER-SALE SERVICE
Any mould problem, we will provide free maintenance service

Why Choose Us?(Advantages)
 
1.We specialized in manufacturing plastic injection mould for over 40 years and 
   received a high evaluation and recognition of our customers .
2. We have a high-level designer team and we adopt advanced machine as 
   CNC\DMG\EDM\CMM. 
3. During mold manufacturing, we keep customer updated with our ONLINE 
   TRACKING SYSTEM, which shows mold process clearly to customer from 
   Steel purchasing till Mold testing.
4. We have strict quality control system.
5. We do not delay any project.


Taizhou Huangyan Yongsheng Mould Co., Ltd, founded in 2007, is located at Zhejiang province. It is near Hangzhou and Ningbo port. And domestic flights can arrive directly. You can go anywhere freely. Our company covers an area of more than 1, 000 meters. We are specializing in the development, production and sales of no gate hot runner cap mould, cut-free independent self-locking gate perform mould, free-gate valve perform mould, anti-theft cap mould, die cut cap mould, handle mould, bottles mould and daily necessities mould. Now we have had first-class experts and production machines.

After many years of efforts and sustained fast developments, we have obtained customers' recognition with our scale, quality and good faith. Now we have got a clear advantage on technologies and equipments levels, quality grades, market share etc. And our core competencies are keeping on being stronger and stronger. It goes without saying that our company will develop steadily, rapidly and healthily. In order to be more professional, solider, stronger and bigger, we insist on perfect quality, good faith and customers first from our foundation, never stopped developing technologies and products.

Now our products are popular in domestic market, and become a famous national brand. In oversea market, they are sold to Americas, Europe, Middle East, Africa and Southeast Asia. We will keep on fast development, strengthening personnel training and introduction, developing technologies, enhancing the capability of independent innovation, accelerating new plastic perform development, improving technology progress and industry upgrade, and carry out "going-out" strategy seriously, take part in the competition actively to open much wider market all over the world.

"YONGSHENG- keeps up with times and makes friends with all over the world"


Q:Are you a factory or trading company?
A: Factory.

Q:Can you make the specific molds according to customers?
A:Yes.

Q: How long is your delivery time?
 A: Generally it is 45-65 days.

Q: Do you provide samples ?
 A: Yes, We will provide samples to our customers after the first molds trial by free.

Q:How to ensure the quality of the product?
A:We have great R & D department and strict quality control department. We will design and manufacture all kinds of molds according to customer's requirements.





Product Tag:
Related categories:
Scroll to Top