Ni Nickel Alloy Cold Rolled N06600 N06625 N07718 N07750 N06601 N06617 Steel Plate Hastelloy C276 Alloy Nickel

Min.Order: 10
Product origin: Wuxi, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 12 ~ 28

Description
Material GradeInconel600(N06600 GH3600),  Inconel601(N06601 GH3600), Inconel625(N06625 GH3625), InconelX-750(N07750 GH4145),  Inconel 718(N07718 GH4169), Inconel690
Monel 400(N04400),Monel K500(N05500)
Hastelloy B-2,Hastelloy C,Hastelloy C-267(N10276),Hastelloy C-4
Hastelloy C-22(N06022),Hastelloy G30(N06030)
StandardGB,ASTM,DIN,JIS,NF,BS,ISO,ROCT
ThicknessCold rolled:0.15mm-10mm
Hot rolled: 3.0mm-180mm 
Width8-3000mm
Length1000mm-11000mm or as customer' s requirement
SurfaceMirror, Brushed, Mill Finished, Polished etc
TechniqueHot Rolled /Cold Rolled
ApplicationEscalator, Elevator, Doors
Furniture
Production tools, Kitchen appliances, freezers, cold rooms
Auto Parts
Machinery and Packaging
Equipment and Medical devices
Transport system
Trade TermsEXW,FOB,CIF CFR
Loading PortShanghai port, Tianjin port, Qindao port
Payment terms1) 30% deposit by T/T, the balance against copy of B/L by T/T.
2) 30% deposit by T/T, the balance by L/C at sight.
3) 100% L/C at sight.
MOQ1Ton
Packing DetailStandard Seaworthy Package or customer requirements
Delivery time1.Usually,within10-20days after receiving deposit or LC.
2.According to the order quantity
SamplesFree samples are provided but the fright is borne by the buyer




High temperature components such as turbine blades, guide vanes, turbine disks,
high pressure compressor disks,machine manufacturing and combustion chambers
used in the manufacture of aviation, naval and industrial gas turbines



OUR SERVICE:
1.Provide free sample. 
2.We have full stock and can deliver within short time.
3.OEM and ODM order are accepted, Any kind of logo printing or design are available.
4.We offer you the different types of product.
5.Good Quality + Factory Price + Quick Response + Reliable Service, is what we are trying best to offer you.
6.All of our products are produced by our professional workman and we have our high-work-effect foreign trade team, you can
totally believe our service. 
After you choose:
1. We will count cheapest shipping cost and send it to your email.
2. Start production immediately after receiving the advance payment.
3.About 10-15 working days to complete the production, and then the customer




Product Tag:
Related categories:
Scroll to Top