A345 Alloy Steel Welded Master Link Assembly for Construction Sites

Min.Order: 10
Product origin: Weifang, Shandong, China
Infringement complaint: complaintComplaint
US$ 0.73 ~ 13.77

Description

A345 Alloy Steel Welded Master Link Assembly for Construction Sites 

Product Description

Supper alloy steel - Quenched and Temperated
Individually prooof test at 2 times Working Load Limit.
Breakage test
100% magnaflux crack detection.
Surface
Treatment: Spraying plastics 
Color code: Red /Yellow /Blue
Main link: Forged.
Sub link: Welded Main link is forged.
ALL SIZE: There will be pressing flat only on request.

Packaging: Cartons, wooden cases, pallets or as per customer's requirements
Special specifications can also be produced according to drawing and sample.

 
Product details

Material

Corbon steel;Alloy steel;stainless steel

UsageMachining, Harbour Handling, Ship building, Power installation, Transportation

Color

Yellow or follow your wishes

Payment Terms

30% deposit in advance, 70% before shipment

M.O.Q

10PCS

Delivery time

10-20days after order confirmation

Notes

Special specifications and marks can be made according to customers requirements;

Other related products

Eye bolts ,Turnbuckles ,Wire Rope Clips ,Shackles ,Chain accessories ,Load binders ,Hooks ,Thimbles ,Connecting Links ,Master Links ,Anchors ,Lashing fittings ,Swivels and many other rigging hardwares .

 
The Master link is a combination of one main ring and two or more sub-rings, in which the main ring is fully forged and the sub-ring is welded. The Angle of the subring must be less than 120° when the ultimate working load is used.

 The Master link is mainly used for assembling lifting tools. connected with the connecting link clasp and chain, which is assembled into a synthetic rigging tool, and used for lifting heavy objects and equipment.

 
 

It is able to transfer long-distance load, withstand various loads and variable loads (load range: 1-500t), with large load safety factor (4-5 times), good flexibility, safe and reliable use, light weight, easy to carry and transport.


 

It has high tensile strength, fatigue strength and impact toughness. It is wear-resistant, aseismic and stable in high speed operation. Good corrosion resistance, able to work in a variety of harmful media in the harsh environment.
Our Advantages

1.Provide OEM/ODM service.
2.Enough stock for most of sizes Quality control based on ISO9001 and 12 months warranty.
3.Free Samples If Need.
4.24 Hours online service, free time to contact us.
5.Low MOQ 10pcs each size.
Fast delivery, most orders can be deliverd in 7-10 Work days.

Application Area

Master link is mainly used in electric power, metallurgy, petroleum, machinery, railway, chemical industry, port, mining, construction and other industries of lifting and hoisting, but also with chain, steel wire rope, connecting link , hook and other accessories to form a sling. Master link and wire rope composed of spars are mostly used in ports and ships, used to lift containers or containers.

Quality Test

How do you control your quality?   
1.Selection of high-quality steel material from famous steel group. 
2.Production process standardization, process standardization, refinement. 
3.100% Finished Product Testing. 
4.The third party product inspections are acceptable. 
5.ISO Quality Management System Certificated Factory 
6.Inspection before loading 

Packaging & Shipping

1).Gunny bag, inside PVC bag and outside gunny bag +pallet
2).Wooden case
3).Iron drum, plastic drum + pallet
4).Wooden/plastic reel +pallet
5).Others as customer required

Introduction to use:"For your safety, please use correctly"
1. Do not use damaged rigging
2. When hoisting, do not twist the noose
3. Do not tie the rigging
4. Avoid overwork
5. Do not drag when moving the rigging
6, Avoid grabbing or shock load
7. Every rigging must be inspected before every use. 8. If rigging is used under possible chemical contamination or at high temperatures, consult the supplier for reference.




 

Scroll to Top