Urea Compound NPK Fertilizer Granulation with Prilling Tower

Min.Order: 1
Product origin: Hengshui, Hebei, China
Infringement complaint: complaintComplaint
US$ 1000000

Description
Product Description

1. Capacity
1.1 design capacity: 100,000t/y
1.2 production capacity: ≥100,000t/y, 18tons/hour, maximum can be 35tons/hour, capacity is different for different formula.
1.3 annual working time: 7200 hours.
1.4 size of hi-tower: Diameter is 15m, height is 120m.
1.5 finished products:
Fine granule  1.8-2.2mm, 8tons/hour
Common granule  2.2-4.3mm, 35tons/hour
1.6 standard
  This unit is for producing nitro-compond fertilizer with hi-tower melting & granulation process, quality of finished products meet GB15063-2020 standard. This unit can produce dual-compond or tri-compond fertilizers through different formulas.
1.7 design scope
Design of construction drawings (process drawings and civil drawings of raw material feeding, cooling, packaging & handling of finished product, 3000m2 warehouse), foundation drawings and frame tower for packaging (16m high) etc.
1.8 specifications of raw material

NameShapeSpecificationremarks
Ammonium dihydrogen phosphate
( (NH4)H2PO4)
powderTotal nutrient ≥55%
H2O:  ≤2%
 
FillerPowder,
mesh 100~150
H2O:  ≤1.0% 
Potassium sulphate
(mannheim process)
PowderK2O  ≥50%
H2O:  ≤1.5%
 
Potassium chloride
 
PowderK2O  ≥60%
H2O:  ≤1.5%

 
Urea liquidLiquidconcentration≥98.5% 
Urea in powder or granulepowder or granuleN≥46% 
Ammonium nitrate
or
Ammonium phosphate
granule35-0-0
or
32-4-0
30-6-0
 
Ammonium chloridepowderN≥25% 
Ammonium sulphatepowderN≥20% 

2. Process flowchart
A. melting of ammonium phosphate (urea)
Solid ammonium phosphate (urea) be crushed and weighing, send to melting vessel for melting, then send to 1# mixing tank.
B. phosphate (potash) salt powder system
Ammonium dihydrogen phosphate powder and fillers through weighing, be sent to 1# mixing tank to mix with ammonium phosphate (urea), then overflow to 2# mixing tank.
C. potash (phosphate) salt powder system
Potassium sulphate powder (ammonium phosphate) through weighing, be sent to 2# mixing tank, overflowing to evenly-mixer, from evenly-mixer to filtering trough, then to granulation machine to spray mixed slurry from top tower.
D. finished product
Granules from top tower will go to 1# sieve (1.8mm-4.3mm) and send to 1# cooling roller, nextly go to 2# sieve (1.8mm-4.3mm) and send to powder cooling device, through cooling to next procedure-coating roller, then through belt to 3# sieve (2.2mm), 1.8-2.2mm granules be sent to small size packaging area, 2.2-4.3mm granules be sent to big size packaging area.

Detailed Photos

Product Parameters

                                Nitro-compond fertilizer (N:15%, P2O5: 15%, K2O: 15%)
                                                  (18 tons/h, anuually 7200hours)

No.NameSpecificationUnitRated consumptionConsumption hourly Consumption annually
1H12N3O4P P2O5≥4%;N≥32%t0.447.9257024
2(NH4)H2PO4P2O5≥44%;N≥11%t0.285.0436288
3K2SO4K2O≥ 50%t0.285.0436288
4Bags50kgpiece20.53692656800
5Water 0.2MPam3
 
 17200
6Circulating water32ºCm3 150 
7Steam 1.3MPat0.1933.474
.
25013
8electricity380VkWH152701944000
9Anti-caking agentOil typet0.00150.027194.4
10Anti-caking agentPowder typet0.00250.045324
11Air for instrument0.6MPam3

M
 120864000
12Compressed air 0.6Mpa(g)m3
 
 320304000
                                 Urea-compond fertilizer (N:17%, P2O5: 17%, K2O: 17%)
                                                 (20 tons/h, anuually 7200hours)
No.NameSpecificationUnitRated consumptionConsumption hourly Consumption annually
1UreaN≥ 46%t0.346.848960
2(NH4)H2PO4P2O5≥ 49%;
N≥  11%
t0.336.647520
3KCLK2O≥ 60%t0.2655.338160
4Filler100-150 mesht0.0651.39360
5bag50kgpiece20.54102952000
6Water 0.2MPam3
 
 17200
7Circulating water32ºCM3 150 
8steam0.8MPat0.173.4
.
24480
9Electricity380VkWH153002160000
10Anti-caking agentOil typet0.00150.03216
11Anti-caking agentPowder typet0.0030.06432
12Air for instrument0.6MPam3

M
 120864000
13Compressed air 0.6Mpa(g)m3
 
 3202304000
Certifications

Company Profile

 

     Hengshui Gains Trade Co., Ltd. Locates in Jizhou City, Hebei Province-biggest production base of FRP products and radiators of China, combines advantages of local different industries, Hengshui Gains Trade Co., Ltd. consists of several large-scale manufacturers, depends on customers' different requirements, we recommend and choose suitable manufacturer to satisfy and fullfill, we can provide design, supply, shipping, installation, commissioning etc one-station service or technical consultation service. From our company to Tianjin seaport is 300km, to nearest airport is 180km, nearest high-speed train station is 90km.
    Our core business and services are:  

  1. FRP/GRP products: FRP vessel & tower, FRP (motar) pipe, FRP cooling tower, FRP grating, FRP electrolytic cells, FRP septic tank
  2. Whole set of FRP products production line and technology: Computer control filament winding machine, FRP pultursion production line, Molded FRP products production line
  3. Radiator
  4.  Electrical cable
  5.  Sluice gate etc facilities for water conservancy
  6.  Rubber bridge bracing
  7.  Whole set of chemical making equipment & technology: Mannheim process potassium sulphate making equipment & technology, Titanium dioxide production equipment & technology, NPK prilling high tower & technology


Cooperation   Win-win

Our Advantages

       Our company established by several manufacturing enterprises jointly, we can provide that design, manufacture, installation supervision etc one-station services.

FAQ

Q: why choose Gains Trade?
A: 15+ years experience in FRP industries, have rich experience that provide different FRP products to Fluor, Technip, Dossan, Arkema, Toyo, Veolia, Wison, Dupont, BASF etc.
Q: Can you choose correct raw material for our FRP product?
A: absolutely, pls provide medium & concentration, temperature, pressure etc technical parameters, PP/FRP, PVC/FRP, PVDF/FRP etc pipe/tank/tower also are in our supply scope. 
Q: what's your delivery time?
A: we have several manufacturing plants, each plant has design department, production facilities, we can finish your FRP products in shortest time.
Q: which port is nearest to your plant?
from our plant to Tianjin seaport is 300km, to Shijiazhuang/Jinan airport is 150km, to Hengshui high-speed train station is 30km.