Model | BS2000iS | BS2250iS | BS2500iS | BS2750iS | BS4500iS |
Rated Output (kw) | 1.8 | 1.8 | 2.3 | 2.2 | 3.5 |
Max Output (kw) | 2.0 | 2.0 | 2.5 | 2.4 | 4.0 |
Rated Voltage(V) | 110V,120V,220V,230V,240V | ||||
Frequency(HZ) | 50Hz/60Hz | ||||
Power Factor | 1.0 | ||||
Engine Model | BS80i | BS80i | BS120i | BS100i | BS225i |
Engine Type | Single cylinder, 4-stroke(OHV) | ||||
Start System | Recoil/Electric | ||||
Alternator | 100% copper | ||||
THD(%) | <2 | ||||
Noise(7M) | 62dB | 62dB | 64dB | 64dB | 64dB |
Fuel Tank Capacity(L) | 4 | 4 | 5 | 4 | 12 |
Gross Weight(kgs) | 22 | 22 | 25 | 23 | 43 |
Package Size(mm) | 510*310*525 | 540*330*545 | 520*320*450 | 540*330*545 | 670*500*570 |
The 100-hours test process of a 3.5KW petrol inverter generator | |||||
Time | Voltage (V) | Current (A) | Power (W) | Frequency (HZ) | |
Day 1 | 18:00 | 227.5 | 15.43 | 3510 | 51.4 |
Day 2 | 7:30 | 228.0 | 15.39 | 3508 | 51.3 |
13:00 | 227.6 | 15.42 | 3510 | 51.3 | |
20:00 | 227.5 | 15.43 | 3510 | 51.4 | |
Day 3 | 7:30 | 228.1 | 15.37 | 3508 | 51.5 |
13:30 | 227.5 | 15.41 | 3507 | 51.4 | |
20:00 | 227.6 | 15.42 | 3507 | 51.3 | |
Day 4 | 7:30 | 228.2 | 15.38 | 3510 | 51.5 |
13:30 | 227.7 | 15.4 | 3507 | 51.6 | |
20:00 | 227.8 | 15.4 | 3509 | 51.5 | |
Day 5 | 7:30 | 228.1 | 15.39 | 3510 | 51.4 |
13:30 | 227.7 | 15.4 | 3508 | 51.3 | |
20:00 | 227.5 | 15.42 | 3509 | 51.3 | |
Day 6 | 7:30 | 228.1 | 15.39 | 3510 | 51.4 |
13:30 | 227.7 | 15.4 | 3508 | 51.2 |