Cassman HLT CLT reference configuration
• Material sus 304 with 100mm insulation
• Net capacity: 1000L
• Heated by steam or electricity elements
• with top manway
• with liquor level
• with for legs and drain outlet at the bottom
About CASSMAN
Jinan Cassman Machinery Co., Ltd. is located in Jinan City, Shandong Province, the factory covers an area of 5,000 square meters, with three workshops of S/S vessels processing, Welding & Assembly, and commissioning.
Equipped with advanced CNC machine, Argon gas welding machine, stainless steel bending machine, pressure vessel detector, etc., Approved by CE,TUV and ISO certifications. We have a technical team with tanks design, brewing consultant, electrician and installation engineers.
Cassman focus on the brewing technology research, design and manufacture.
We provide home brew equipment(50L-100L), craft brewing equipment(200L-3000L) and industrial brewery equipment(1000L-20000L), which included the malt milling, brew house system, beer fermentation/servicing tank, cold/hot liquor system, packaging line and control system.
Our after sales service including the installation and brewing technology transfer.
Name | Complete microbrewery craft beer brewery equipment configuration |
Grain Miller | Miller with double roller |
Brewhouse System | Including Mash Tun, Lauter tun, Kettle Tun, and Whirlpool tank; Heating way: Electricity heating, direct fire heating or steam heating; With grain rake, false bottom, spray ball, etc; |
Fermenter | Fermentation tanks (the capacity is based on the brew batch; the quantity is based on the production); Other accessories are available: 1. L-Pipe; 2. Butterfly Valve; 3. Pressure Gage; 4. Solenoid Valve; 5. Vacuum Valve; 6. Cooling Pipe; 7. Thermal Insulation Pipe;8.Spending valve |
Glycol cooling unit | Glycol water tank, Coldwater tank, Refrigeration chiller Machine; Sanitary centrifugal pump for glycol water and cold water recycle among tanks and heat exchanger; All pipes, fitting, insulation materials are included. |
CIP cart | Sterilization Tank, Caustic tank, Hot water tank Thickness is 2mm; Weld slinging band; Valves, accessories supporting; All welding is argon protection single-sided, double-sided forming; Function: Clean in place for tanks |
Control panel | PID semi-auto controller, PLC auto controller, a brand is Siemens, LG for optional. Electric components have CE Certificate. Offer floor type and wall hanging assembling. Control all the tank's temperature, motor, and pump's show on/off. |
Filter Unit | Kieselguhr filter, Membrane filter; Filtered beer tanks/bright beer tank; In the restaurant, beers are always served as craft beer without filtration. |
Filling system | Keg filling and washing Machine; Bottle capping and filling Machine. Keg filling and washing Machine; Bottle capping and filling Machine. |
Other facilities | steam boiler, steam pipe, all the pipes for the brewhouse unit and glycol cooling unit, and so on. |
Our service
Warranty:
Equipment warranty includes tank warranty, electric parts warranty, auxiliary parts warranty, etc. .
1, Cassman provides 3-5 years warranty for the main tank, 1 year warranty for electrical components and auxiliary parts, etc., and lifetime after-sales service.
2, In order to ensure the normal operation of the brewery, we can provide a separate set of spare parts according to the customer's request, customers can replace parts in case of abrasion damage.
Maintenance:
During operation, daily maintenance for the equipment is important. Cassman will provide maintenance guide., if need, we can send engineer to customer's site for repair and maintenance.
Beer equipment model selection:
1, Based on years of experience, Cassman can provide standard models of beer brewing equipment. We have mature experience in brewing technology and equipment design.
2, Cassman can provide custom-made service as per customer's requirement. including customize brewhouse system, fermentation tank, brite beer tank, coffee equipment, whiskey distillation equipment, stainless steel tank, etc.
Brewery design:
Cassman can help to design layout for newly built brewery, and we will supply P&ID drawings, electrical connection diagrams,flow chart, tank drawings, etc. , 3D drawings are also available if needs.
Installation:
Cassman has 6 to 8 experienced technical engineers, we can provide on-site installation and debugging instruction as per customer's needs.
1, To ensure good after-sales service, we will appoint the same technical personnel to debug and load the equipment before delivery,
2, For single tank, if on-site installation service is unnecessary, Cassman will provide equipment drawings and installation guides so that customers can install by themselves.