1. The elevation indicated in the figure is in meters, and the remaining dimensions are in millimeters. All embedded parts are provided by the user.
2. The allowable bearing capacity fk of the foundation is greater than or equal to 100Kpa, the vertical bearing capacity of each embedded slab is 180KN, and the horizontal bearing capacity is 10OKN. If the foundation soil is collapsible loess, expansive soil or frozen soil layer, additional measures shall be taken for the foundation.
3. Unless otherwise specified, the rest of the concrete is C30.
4. A 200mm thick C30 concrete cushion needs to be set in the entire base range
5. The relative error of the center of each base plate is (the front and back, left and right, and the diagonal must not be greater than 10mm
6. For the second concrete grouting, the anchor bolts should be perpendicular to the foundation slab, with an error of no more than 2mm. It is recommended to use wooden boards to simulate the positioning of the foundation slab when grouting for the first time. The foundation slabs should be in the same horizontal plane with an error of no more than 3mm. When grouting, adjust the anchor bolts to make the embedded plate M1 on the same horizontal plane. The error is less than 3mm;
7. Add 150-thick gravel cushion after tamping the plain soil under the slope.
8. The direction of the cable pipe and the location and type of drainage are solved by themselves according to the location of the weighing room on the user site and the condition of the sewer.
9. The bending radius of the bend of the threading pipe should be greater than 6 times the outer diameter of the cable pipe. If there are too many bending points, consider setting up transition wells.
10. Basic grounding requirements. Its grounding resistance is less than 4 ohms.