High quality/High cost performance Smartgen Generator Controller Panel Hgm180hc Auto Start Engine Control Module

Min.Order: 1
Product origin: Fuzhou, Fujian, China
Infringement complaint: complaintComplaint
US$ 40 ~ 200

Description
high quality Smartgen Generator Controller panel HGM180HC Auto Start Engine Control Module
Datakom Automatic Mains Failure Monitoring Control Unit DKG-105 For Generator Engine  can completely replace with it. It has the function of auto mains (utility) failure control modules monitor incoming mains (utility) supplies and instruct gen-sets to start when mains (utility) power is not available. All modules include a range of intelligent control, monitoring and protection features for standard and electronic engine gen-set applications.
Smartgen Generator Controller HGM180HC Auto start Engine Control Module
Controll Funtion
Protection Funtion
Data display
Auto-test Commercial power
Low-Lubrition Oil
Battery Voltage
Emergence Stop
Charging failure
Oil pressure
Manual Start/STOP
Over Voltage,Over load
Operation Time
Long-Distance Start/Stop
High water temperature
Frequency
Auto quit of Start motor
Over frequency
Voltage
Double power swicth transfer controll
Low Frequency
Amper
 
Stop Failure
Water Temperature
 
Start Failure
Speed


Our Services
Guangling strictly adopt the international warranty.
Warranty: Guarantee for one year or 1000 running hours (accord to whichever reach first) from shipment date.
During the guarantee period, guangling will provide the free easy-damaged spare parts for problems caused
by our quality of production or raw material, except the damageable spare parts caused by customer's incorrect man-
made operation.
After expiration, Guangling provides cost spare-parts maintenance for gensets .
FAQ
Q1: What is your MOQ of this item?
A: 1 pcs
Q2: What is the lead time?
A:2days after receiving your L/C or TT deposit.But if your order is some special engine and alternator, then the delivery time is
longer.
Q3: Is it able to make customer's own brand name?
A: We can be your OEM manufacture with your authorization of brand.
Q4: Where is your Loading Port?
A: Any port in China. Usually Fuzhou port.
Q5: What is your payment term?
A: We can accept T/T 30% in advance, and the balance 70% shall be paid before shipment or L/C at sight, L/C deferred payment terms
or west union.
Q6: What is your company's available production capacity?
A:1000 000000
For More details,can send us inqury to know Factory Pirce!
Product Tag:
Related categories:
Scroll to Top